Open Violations
22
DOB + HPD
Unpaid Fines
$0
OATH / ECB
Flood Zone
X
FEMA designation
Safety Score
53
Composite index
Get the same due-diligence a paralegal charges $400+ for — instantly, $14.99. Refund if the report fails to generate or upstream NYC data was retracted (policy).
Free preview — Pro unlocks: owner of record · mortgage details · fine amounts · permit costs · school ratings · neighborhood demographics Unlock full report →
1 item
CRIT22 open violations on record· DOB · HPD
✓ Verified · PLUTO
Building Area
48,780 sf
Commercial Area
6,405 sf
Zoning
R7-1 · C1-4 overlay
Basement
Partial Basement
Land Use
Mixed Residential & Commercial
Registered Owner
Quick facts
- How many units does this building have?
- 35 residential units and 1 commercial space.
- How tall is this building?
- 5 stories, non-fireproof construction, built in 1926.
- How big is the lot?
- 12,850 sq ft (100 ft × 130 ft).
- What's the building class?
- Class C7 — Walk-up apt.
- How many buildings are on this lot?
- 1 building on the lot.
Overall Outlook
Long-term signal for residential or commercial viability
Elevated Risk
Maintenance Reliability
Multiple open violations — proceed with caution
46 / 100
Safety
Elevated activity — consider before signing
53 / 100
Daily Life
Transit access via 161 St-Yankee Stadium (4)
~9 min subway
Violations & Maintenance History
HPD · DOB · OATH — 22 open, 28 resolved
Tip: this building has 35 residential units and 22 open violations across all of them. To see only the records affecting your apartment, run a new search with your unit number (e.g. 5A or PH2) in the APT / UNIT field on the homepage.
Open Issues — 22
Minor
(a) § HMC: file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPD s website, www. NYC. Gov\hpd, search bed bugs.
HPD · Filed Apr 2026 · Open
Minor
Paint with light colored paint all peeling paint surfaces
§ 27-2013 ADM CODEApt 1G · 1st floor
HPD · Filed Oct 2025 · Open ·
Minor
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling
§ 27-2005 ADM CODEApt 4M · 4th floor · 1st apartment from south at west
HPD · Filed Sep 2025 · Open ·
Minor
Properly repair or replace the broken or defective 1st metal riser from top at public hall stairs, 1st story, section ''north ''
§ 27-2005 HMC
HPD · Filed Sep 2025 · Open ·
Minor
Properly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub
§ 27-2005 ADM CODEApt 4M · 4th floor · 1st apartment from south at west
HPD · Filed Sep 2025 · Open ·
+ 17 more open records
Resolved History — 28 (showing 3)
Closed
§ 27-2005, 2007 ADM code remove device preventing door from being self-closing door sweep
Apt 2L · 2nd floor · 2nd apartment from south at west
HPD · Filed Sep 2025 · Closed ·
Closed
§ 27-2026, 2027 HMC: properly repair the source and abate the evidence of a water leak at ceiling
Apt 4M · 4th floor · 1st apartment from south at west
HPD · Filed Sep 2025 · Closed ·
Closed
Repair the roof so that it will not leak at south roof bulkhead north, east, and west walls , section ''south''
§ 27-2005 ADM CODE
HPD · Filed Sep 2025 · Closed ·
+ 25 older resolved records