Skip to main content
New search

Property Audit Report

127-02 116 Avenue

Caution — Review Before Signing
BBL 4116840001Type 1-family homeGenerated May 24, 2026View on Google Maps

Open Violations

145

DOB + HPD

Unpaid Fines

$0

OATH / ECB

Flood Zone

X

FEMA designation

Safety Score

71

Composite index

Unlock the full 15-page report — $14.99

Get the same due-diligence a paralegal charges $400+ for — instantly, $14.99. Refund if the report fails to generate or upstream NYC data was retracted (policy).

Free previewPro unlocks: owner of record · mortgage details · fine amounts · permit costs · school ratings · neighborhood demographics Unlock full report
Key Findings
1 item
CRIT145 open violations on record· DOB · HPD
Building Details
✓ Verified · PLUTO
Building Area
896 sf
Zoning
R3-2
Basement
Partial Basement
Registered Owner
Quick facts
How many units does this building have?
1 residential unit.
How tall is this building?
2 stories, g construction, built in 1925.
How big is the lot?
2,000 sq ft (20 ft × 100 ft).
What's the building class?
Class A1 — 1-family home.
How many buildings are on this lot?
2 buildings on the lot.
Overall Outlook
Long-term signal for residential or commercial viability
Elevated Risk
Maintenance Reliability
Multiple open violations — proceed with caution
20 / 100
Safety
Moderate activity — typical urban
71 / 100
Daily Life
Transit access via Ozone Park-Lefferts Blvd (A)
~19 min subway
Violations & Maintenance History
HPD · DOB · OATH41 open, 9 resolved
Open Issues — 41
Minor
In. Code: properly repair with similar material the broken or defective brickwork and mortar at4th riser from bottom up at stairs, building front
§ 27-2005 ADM
HPD · Filed Jul 2025 · Open ·
Minor
§ 27-2046.1 HMC: repair or replace the carbon monoxide detecting device(s). Defective
Apt PRIVAT · 1st floor · 1st apartment from east at south
HPD · Filed May 2025 · Open ·
Minor
Properly repair or replace the broken or defective electrical light fixture at ceiling
§ 27-2005 HMCApt PRIVAT · 1st floor · 3rd room from north at east · 1st apartment from east at south
HPD · Filed May 2025 · Open ·
Minor
Properly repair or replace the broken or defective electrical light fixture at ceiling
§ 27-2005 HMCApt PRIVAT · 1st floor · 1st apartment from east at south
HPD · Filed May 2025 · Open ·
Minor
§ 27-2037, 2038 HMC: provide a safe and adequate supply of electric service to the fixtures ceiling
Apt PRIVAT · 1st floor · 2nd room from north · 1st apartment from east at south
HPD · Filed Jan 2025 · Open ·
+ 36 more open records
Resolved History — 9 (showing 3)
Closed
In. Code: properly secure the loose stone nosing 4th from bottom up, stairs at building front
§ 27-2005 ADM
HPD · Filed Jul 2025 · Closed ·
Closed
In. Code: properly repair with similar material the broken or defective masonary concrete floor, at building front porch
§ 27-2005 ADM
HPD · Filed Jul 2025 · Closed ·
Closed
In. Code: provide an adequate supply of heat for the apartment
§ 27-2029 ADMApt PH · 1st floor · 1st apartment from east at south
HPD · Filed Jan 2025 · Closed ·
+ 6 older resolved records