Open Violations
191
DOB + HPD
Unpaid Fines
$0
OATH / ECB
Flood Zone
X
FEMA designation
Safety Score
44
Composite index
Get the same due-diligence a paralegal charges $400+ for — instantly, $14.99. Refund if the report fails to generate or upstream NYC data was retracted (policy).
Free preview — Pro unlocks: owner of record · mortgage details · fine amounts · permit costs · school ratings · neighborhood demographics Unlock full report →
3 items
CRIT191 open violations on record· DOB · HPD
INFOAnnual property tax estimated at ~$95,167 (Tax Class 2)· NYC DOF
INFOMost recent mortgage: $574,365 from FLUSHING BANK in 2016 (+1 more on Financials)· ACRIS
✓ Verified · PLUTO
Building Area
18,000 sf
Commercial Area
4,500 sf
Zoning
C4-3
Basement
Partial Basement
Land Use
Mixed Residential & Commercial
Registered Owner
Quick facts
- How many units does this building have?
- 19 residential units and 6 commercial spaces.
- How tall is this building?
- 4 stories, fireproof construction, built in 1915.
- How big is the lot?
- 5,008 sq ft (100 ft × 50.08 ft).
- What's the building class?
- Class C7 — Walk-up apt.
- How many buildings are on this lot?
- 1 building on the lot.
Overall Outlook
Long-term signal for residential or commercial viability
Elevated Risk
Maintenance Reliability
Multiple open violations — proceed with caution
20 / 100
Safety
Elevated activity — consider before signing
44 / 100
Daily Life
Transit access via Crown Hts-Utica Av (3 4)
~3 min subway
Violations & Maintenance History
HPD · DOB · OATH — 50 open, 0 resolved
Tip: this building has 19 residential units and 50 open violations across all of them. To see only the records affecting your apartment, run a new search with your unit number (e.g. 5A or PH2) in the APT / UNIT field on the homepage.
Open Issues — 50
Critical
§ 27-2056.6 ADM code - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, 1st door frame from south at west wall, 1st window frame from east at south wall
Apt 1 · 1st floor · 4th room from north at east · 1st apartment from south at west
HPD · Filed May 2026 · Open ·
Critical
§ 27-2056.6 ADM code - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at west wall, 1st door frame from east at south wall, south wall, east wall, west wall
Apt 1 · 1st floor · 1st apartment from south at west
HPD · Filed May 2026 · Open ·
Minor
Paint with light colored paint the 1st closet from west at north wall door
§ 27-2013 ADM CODEApt 1 · 1st floor · 1st apartment from south at west
HPD · Filed May 2026 · Open ·
Critical
§ 27-2005, 2006, 2037 HMC: properly repair and abate unsafe electric wiring condition consisting of light fixture with exposed wires tied with wire below balcony , southeast section building front yard , at fire escape, 2nd story
HPD · Filed May 2026 · Open
Minor
Properly repair with similar material the broken or defective cracked , dislodged, ceramic floor tiles, at public hall, 1st story
§ 27-2005 ADM CODE
HPD · Filed May 2026 · Open ·
+ 45 more open records