Get the same due-diligence a paralegal charges $400+ for — instantly, $14.99. Refund if the report fails to generate or upstream NYC data was retracted (policy).
Free preview — Pro unlocks: owner of record · mortgage details · fine amounts · permit costs · school ratings · neighborhood demographicsUnlock full report →
Key Findings
2 items
CRIT125 open violations on record· DOB · HPD
INFOAnnual property tax estimated at ~$4,383,274 (Tax Class 2) — assessed per building, not per unit· NYC DOF
Building Details
✓ Verified · PLUTO
Building Area
183,621 sf
Commercial Area
21,727 sf
Zoning
C2-6
Basement
Converted
Garage
Y
Land Use
Mixed Residential & Commercial
Registered Owner
175 W 12 St Condominium
Quick facts
How many units does this building have?
214 residential units and 10 commercial spaces.
How tall is this building?
19 stories, built in 1963.
How big is the lot?
15,435 sq ft (159.5 ft × 95 ft).
What's the building class?
Class RM — Condo.
How many buildings are on this lot?
1 building on the lot.
Overall Outlook
Long-term signal for residential or commercial viability
Elevated Risk
Maintenance Reliability
Multiple open violations — proceed with caution
20 / 100
Safety
Moderate activity — typical urban
77 / 100
Daily Life
Transit access via 14 St (1 2 3)
~1 min subway
Violations & Maintenance History
HPD · DOB · OATH — 33 open, 22 resolved
Tip: this building has 214 residential units and 33 open violations across all of them. To see only the records affecting your apartment, run a new search with your unit number (e.g. 5A or PH2) in the APT / UNIT field on the homepage.
Open Issues — 33
Minor
Properly repair the broken or defective left slider window sash at east prevented from sliding
§ 27-2005 ADM CODEApt 15M · 14th floor · 1st room from east · 3rd apartment from north at east
HPD · Filed Aug 2021 · Open ·
Minor
§ 329, M/D law and DEPT. Rules and regs. Provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
HPD · Filed Oct 2020 · Open
Minor
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling
§ 27-2005 ADM CODEApt 8J · 8th floor · 1st room from east at south · 1st apartment from north at east
HPD · Filed Oct 2020 · Open ·
Minor
HMC ADM code: § 27-2017.4 abate the infestation consisting of vermin water bugs in kitchen and bathroom
Apt 17C · 17th floor · 2nd apartment from south at west
HPD · Filed Jun 2020 · Open ·
Minor
HMC ADM code: § 27-2017.4 abate the infestation consisting of mice
Apt 17C · 17th floor · 2nd apartment from south at west
HPD · Filed Jun 2020 · Open ·
+ 28 more open records
Resolved History — 22 (showing 3)
Closed
Work does not conform to approved construction documents and/or approved amendments. At time of inspection of a 19 story building under facade renovation, I observed the following conditions which were controlled
OATH · Filed Aug 2021 · Closed
Closed
Failure to safeguard all persons and property affected by constructionoperations. At time of inspection of a 19 story building under facade restoration, I observed a storage area on the 2nd exp4 setback with cons
OATH · Filed Aug 2021 · Closed
Closed
Compliance w/ construction documents, work not conform to approved/amended plans. Note: upon review of cd-5 for installation of suspended scaffold drawings show installation of parapet clamps unto parapet wall w/