Get the same due-diligence a paralegal charges $400+ for — instantly, $14.99. Refund if the report fails to generate or upstream NYC data was retracted (policy).
Free preview — Pro unlocks: owner of record · mortgage details · fine amounts · permit costs · school ratings · neighborhood demographicsUnlock full report →
Key Findings
3 items
CRIT659 open violations on record· DOB · HPD
INFOAnnual property tax estimated at ~$117,855 (Tax Class 2)· NYC DOF
INFOMost recent mortgage: $2,064,384 from NEW YORK COMMUNITY BANK in 2018 (+5 more on Financials)· ACRIS
Building Details
✓ Verified · PLUTO
Building Area
33,722 sf
Commercial Area
1,250 sf
Zoning
R6A
Basement
0
Land Use
Mixed Residential & Commercial
Registered Owner
2179 Realty Construction LLC
Quick facts
How many units does this building have?
36 residential units and 2 commercial spaces.
How tall is this building?
6 stories, non-fireproof construction, built in 1912.
How big is the lot?
7,250 sq ft (50 ft × 145 ft).
What's the building class?
Class C7 — Walk-up apt.
How many buildings are on this lot?
1 building on the lot.
Overall Outlook
Long-term signal for residential or commercial viability
Elevated Risk
Maintenance Reliability
Multiple open violations — proceed with caution
20 / 100
Safety
Moderate activity — typical urban
66 / 100
Daily Life
Transit access via 182-183 Sts (B D)
~7 min subway
Violations & Maintenance History
HPD · DOB · OATH — 49 open, 3 resolved
Tip: this building has 36 residential units and 49 open violations across all of them. To see only the records affecting your apartment, run a new search with your unit number (e.g. 5A or PH2) in the APT / UNIT field on the homepage.
Open Issues — 49
Minor
Provide ready access to buildings heating system door padlocked at cellar
§ 27-2033 ADM CODE
HPD · Filed May 2026 · Open ·
Minor
Provide hot water at all hot water fixtures
§ 27-2031 ADM CODEApt 21 · 4th floor · 1st apartment from north at east
HPD · Filed May 2026 · Open ·
Minor
§ 53, 187, 231 M/D law and department rules and regulations. Provide a shoe properly secured to bottom of string of dropladder at north exterior wall at fire passage way
HPD · Filed May 2026 · Open
Minor
§ 27-2037, 2038 HMC: provide a safe and adequate supply of electric service to the fixtures at ceiling
Apt 21 · 4th floor · 1st room from east at south · 1st apartment from north at east
HPD · Filed May 2026 · Open ·
Minor
Properly repair or replace the broken or defective entire mailbox at public hall, 1st story
§ 27-2005 HMC
HPD · Filed May 2026 · Open ·
+ 44 more open records
Resolved History — 3
Closed
Properly repair or replace the broken or defective boiler burner that is mis calibrated causing boiler to shut off at cellar
§ 27-2005 HMC
HPD · Filed Jan 2026 · Closed ·
Closed
Provide ready access to buildings heating system door locked at boiler room, 1st story
§ 27-2033 ADM CODE
HPD · Filed Jan 2026 · Closed ·
Closed
Failure to maintain building in code compliant manner: use of prohibited door and/or hardware per BC 1008.1.8: 27-371(j). I observed the exit door near the 1st floor staircase does not close properly. The door