Get the same due-diligence a paralegal charges $400+ for — instantly, $14.99. Refund if the report fails to generate or upstream NYC data was retracted (policy).
Free preview — Pro unlocks: owner of record · mortgage details · fine amounts · permit costs · school ratings · neighborhood demographicsUnlock full report →
Key Findings
4 items
CRIT99 open violations on record· DOB · HPD
INFOAnnual property tax estimated at ~$50,289 (Tax Class 2)· NYC DOF
INFOLast sold for $1,100,000 in September 2025· ACRIS
INFOMost recent mortgage: $825,000 from BROADVIEW CAPITAL LLC in 2025 (+2 more on Financials)· ACRIS
Building Details
✓ Verified · PLUTO
Building Area
4,080 sf
Zoning
R7-1
Basement
Converted
Land Use
Multi-Family Walk-Up Buildings
Registered Owner
2366 Davidson LLC
Quick facts
How many units does this building have?
4 residential units.
How tall is this building?
2 stories, g construction, built in 1933.
How big is the lot?
3,113 sq ft (34.58 ft × 90 ft).
What's the building class?
Class C3 — Walk-up apt.
How many buildings are on this lot?
1 building on the lot.
Overall Outlook
Long-term signal for residential or commercial viability
Elevated Risk
Maintenance Reliability
Multiple open violations — proceed with caution
20 / 100
Safety
Elevated activity — consider before signing
54 / 100
Daily Life
Transit access via 183 St (4)
~3 min subway
Violations & Maintenance History
HPD · DOB · OATH — 41 open, 12 resolved
Tip: this building has 4 residential units and 41 open violations across all of them. To see only the records affecting your apartment, run a new search with your unit number (e.g. 5A or PH2) in the APT / UNIT field on the homepage.
Open Issues — 41
Minor
(a) § HMC: file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPD s website, www. NYC. Gov\hpd, search bed bugs.
HPD · Filed Apr 2026 · Open
Minor
Abate the nuisance consisting of hot water exceeding the maximum of 130F degrees at kitchen and bathroom
§ 27-2005 ADM CODE & 309 M/D LAWApt 2S · 2nd floor · 1st apartment from west at north
HPD · Filed Feb 2025 · Open ·
Minor
§ 27-2026, 2027 HMC: properly repair the source and abate the evidence of a water leak at north wall
Apt 2S · 2nd floor · 3rd room from north · 1st apartment from west at north
HPD · Filed Feb 2025 · Open ·
Minor
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall
§ 27-2005 ADM CODEApt 2S · 2nd floor · 2nd room from north · 1st apartment from west at north
HPD · Filed Feb 2025 · Open ·
Minor
§ 27-2026, 2027 HMC: properly repair the source and abate the evidence of a water leak at west wall
Apt 2S · 2nd floor · 2nd room from north · 1st apartment from west at north
HPD · Filed Feb 2025 · Open ·
+ 36 more open records
Resolved History — 12 (showing 3)
Closed
Stop all work entire site. I observed structural work performed on all 3 levels which is contrary to the approved plans. Openings have been made and lintels were installed into a structural wall at exposure 2 t
OATH · Filed Dec 2025 · Closed
Closed
At time of inspection observed inadequate housekeeping on active construction site. Observed egress paths blocked by debris and materials. On construction super logs observed several days with notes about clear
OATH · Filed Nov 2025 · Closed
Closed
At time of inspection observed active construction site. Construction superintendent is assign to this job application. Competent person on site, upon requesting site safety plan to cp he didn't attempt to look