Open Violations
141
DOB + HPD
Unpaid Fines
$1k
OATH / ECB
Flood Zone
X
FEMA designation
Safety Score
90
Composite index
Get the same due-diligence a paralegal charges $400+ for — instantly, $14.99. Refund if the report fails to generate or upstream NYC data was retracted (policy).
Free preview — Pro unlocks: owner of record · mortgage details · fine amounts · permit costs · school ratings · neighborhood demographics Unlock full report →
3 items
CRIT141 open violations on record· DOB · HPD
INFOAnnual property tax estimated at ~$430,958 (Tax Class 2)· NYC DOF
INFOMost recent mortgage: $4,267,590 from BARCLAY CAPITAL REAL ESTATE INC in 2024 (+2 more on Financials)· ACRIS
✓ Verified · PLUTO
Building Area
52,446 sf
Zoning
R7-2
Basement
Partial Basement
Land Use
Multi-Family Elevator Buildings
Registered Owner
Quick facts
- How many units does this building have?
- 53 residential units.
- How tall is this building?
- 6 stories, non-fireproof construction, built in 1930.
- How big is the lot?
- 12,525 sq ft (156.83 ft × 85 ft).
- What's the building class?
- Class D1 — Elevator apt.
- How many buildings are on this lot?
- 1 building on the lot.
Overall Outlook
Long-term signal for residential or commercial viability
Elevated Risk
Maintenance Reliability
Multiple open violations — proceed with caution
20 / 100
Safety
Stable low-activity area
90 / 100
Daily Life
Transit access via 190 St (A)
~5 min subway
Violations & Maintenance History
HPD · DOB · OATH — 44 open, 14 resolved
Tip: this building has 53 residential units and 44 open violations across all of them. To see only the records affecting your apartment, run a new search with your unit number (e.g. 5A or PH2) in the APT / UNIT field on the homepage.
Open Issues — 44
Minor
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling
§ 27-2005 ADM CODEApt 6D · 6th floor · 6th room from north · 1st apartment from west at north
HPD · Filed Apr 2026 · Open ·
Minor
Repair the roof so that it will not leak above ceiling
§ 27-2005 ADM CODEApt 6D · 6th floor · 6th room from north · 1st apartment from west at north
HPD · Filed Apr 2026 · Open ·
Minor
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall
§ 27-2005 ADM CODEApt 6D · 6th floor · 1st room from north · 1st apartment from west at north
HPD · Filed Apr 2026 · Open ·
Minor
Cease use item: uneven brake pad wear on right side brake pad. As per (appendix k1, section 8.6.4.6.1) remedy: correct and email the elevator division at eir@buildings. NYC. Gov for a re-inspection to lift the ce
OATH · Filed Apr 2026 · Open
Minor
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( c) mdl and 28 rcny §25-171: replace or repair the self-closing doors that is missing or defective hinges
Apt 6E · 6th floor · 1st apartment from north at east
HPD · Filed Jul 2025 · Open ·
+ 39 more open records
Resolved History — 14 (showing 3)
Closed
(a) § HMC: file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPD s website, www. NYC. Gov\hpd, search bed bugs.
HPD · Filed Apr 2026 · Closed
Closed
At time of inspection observed failure to maintain excessive construction bags of debris left on the roof over night creating unsafe condition under active job permit #m00828838-i1-gc which expires on 3/24/2026
OATH · Filed Mar 2026 · Closed
Closed
Properly repair with similar material the broken or defective ... Fire retardant material at ceiling and north wall at bulkhead , 6th story, section ''south''
§ 27-2005 ADM CODE
HPD · Filed Aug 2025 · Closed ·
+ 11 older resolved records