Get the same due-diligence a paralegal charges $400+ for — instantly, $14.99. Refund if the report fails to generate or upstream NYC data was retracted (policy).
Free preview — Pro unlocks: owner of record · mortgage details · fine amounts · permit costs · school ratings · neighborhood demographicsUnlock full report →
Key Findings
4 items
CRIT102 open violations on record· DOB · HPD
INFOAnnual property tax estimated at ~$34,887 (Tax Class 2)· NYC DOF
INFOLast sold for $975,000 in November 2024· ACRIS
INFOMost recent mortgage: $4,000,000 from NORTHEAST COMMUNITY BANK in 2025 (+6 more on Financials)· ACRIS
Building Details
✓ Verified · PLUTO
Building Area
10,364 sf
Zoning
R8
Basement
Converted
Land Use
Multi-Family Elevator Buildings
Registered Owner
2683 Creston LLC
Quick facts
How many units does this building have?
22 residential units.
How tall is this building?
6 stories, built in 2025.
How big is the lot?
2,500 sq ft (25 ft × 100 ft).
What's the building class?
Class D1 — Elevator apt.
How many buildings are on this lot?
1 building on the lot.
Overall Outlook
Long-term signal for residential or commercial viability
Elevated Risk
Maintenance Reliability
Multiple open violations — proceed with caution
20 / 100
Safety
Elevated activity — consider before signing
47 / 100
Daily Life
Transit access via Kingsbridge Rd (B D)
~2 min subway
Violations & Maintenance History
HPD · DOB · OATH — 51 open, 3 resolved
Tip: this building has 22 residential units and 51 open violations across all of them. To see only the records affecting your apartment, run a new search with your unit number (e.g. 5A or PH2) in the APT / UNIT field on the homepage.
Open Issues — 51
Minor
Facade work completed, c-hooks, tiebacks and equipment related to system removed and stored in the roof. No notification to the department for the removal. Stop all exterior work at all exposures. Provide notif
OATH · Filed May 2026 · Open
Critical
Partial stop work order issued on 04-16-2026 under complaint #243891 for failure to notify install c-hooks & required documents without re-inspection to clear pswo. May 5, 2026, facade work completed w/ c-hooks
OATH · Filed May 2026 · Open
Minor
Obser. C-hook susp. Scaff. Installed @ expo 1&3 with parapet clamps installed as well. Upon request for plans, parapet stability letter, manufacturer specifications, and pre/post installation letter, none was p
OATH · Filed Apr 2026 · Open
Minor
Observ. Suspended scaffold installed @ expo 1&3. Upon review of DOB systems no notification was provided to the department prior to the installation of suspended scaffold. Upon request to worker to provide susp
OATH · Filed Apr 2026 · Open
Minor
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling
§ 27-2005 ADM CODEApt 2 · 3rd floor
HPD · Filed Apr 2024 · Open ·
+ 46 more open records
Resolved History — 3
Closed
In. Code: provide hot water at all hot water fixtures
§ 27-2031 ADMApt 1 · 2nd floor · 1st apartment from south at west
HPD · Filed Dec 2023 · Closed ·
Closed
§ 27-2017.3 HMC: trace and repair the source and abate the visible mold condition... Approximately 4 sq. Ft at ceiling
Apt 1 · 1st floor · 1st apartment from south at west
HPD · Filed Nov 2023 · Closed ·
Closed
§ 27-2017.3 HMC: trace and repair the source and abate the visible mold condition... Approx. 4 sq ft at ceiling
Apt 1 · 1st floor · 1st apartment from south at west