Get the same due-diligence a paralegal charges $400+ for — instantly, $14.99. Refund if the report fails to generate or upstream NYC data was retracted (policy).
Free preview — Pro unlocks: owner of record · mortgage details · fine amounts · permit costs · school ratings · neighborhood demographicsUnlock full report →
Key Findings
2 items
CRIT397 open violations on record· DOB · HPD
INFOAnnual property tax estimated at ~$72,314 (Tax Class 2)· NYC DOF
Building Details
✓ Verified · PLUTO
Building Area
10,612 sf
Commercial Area
2,653 sf
Zoning
R7B
Basement
Full Basement
Land Use
Mixed Residential & Commercial
Registered Owner
Justal Realty Groupinc
Quick facts
How many units does this building have?
8 residential units and 2 commercial spaces.
How tall is this building?
4 stories, non-fireproof construction, built in 1910.
How big is the lot?
3,229 sq ft (32 ft × 100.92 ft).
What's the building class?
Class C7 — Walk-up apt.
How many buildings are on this lot?
1 building on the lot.
Overall Outlook
Long-term signal for residential or commercial viability
Elevated Risk
Maintenance Reliability
Multiple open violations — proceed with caution
20 / 100
Safety
Moderate activity — typical urban
70 / 100
Daily Life
Transit access via 116 St (6)
~5 min subway
Violations & Maintenance History
HPD · DOB · OATH — 59 open, 0 resolved
Tip: this building has 8 residential units and 59 open violations across all of them. To see only the records affecting your apartment, run a new search with your unit number (e.g. 5A or PH2) in the APT / UNIT field on the homepage.
Open Issues — 59
Critical
§ 27-2056.6 ADM code - correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) east wall
Apt 3B · 3rd floor · 2nd apartment from east at south
HPD · Filed May 2026 · Open ·
Critical
§ 27-2056.6 ADM code - correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st radiator from east at south wall, north wall, south wall
Apt 3B · 3rd floor · 2nd room from north · 2nd apartment from east at south
HPD · Filed May 2026 · Open ·
Critical
§ 27-2056.6 ADM code - correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) west wall
Apt 3B · 3rd floor · 2nd apartment from east at south
HPD · Filed May 2026 · Open ·
Critical
§ 27-2056.6 ADM code - correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) east wall
Apt 3B · 3rd floor · 2nd apartment from east at south
HPD · Filed May 2026 · Open ·
Critical
§ 27-2056.6 ADM code - correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st riser from north at east wall, south wall
Apt 3B · 3rd floor · 1st room from north · 2nd apartment from east at south