Open Violations
153
DOB + HPD
Unpaid Fines
$7k
OATH / ECB
Flood Zone
X
FEMA designation
Safety Score
72
Composite index
Get the same due-diligence a paralegal charges $400+ for — instantly, $14.99. Refund if the report fails to generate or upstream NYC data was retracted (policy).
Free preview — Pro unlocks: owner of record · mortgage details · fine amounts · permit costs · school ratings · neighborhood demographics Unlock full report →
2 items
CRIT153 open violations on record· DOB · HPD
INFOAnnual property tax estimated at ~$178,301 (Tax Class 2)· NYC DOF
✓ Verified · PLUTO
Building Area
57,060 sf
Commercial Area
5,000 sf
Zoning
R8 / R6A · C1-4 overlay
Basement
Partial Basement
Land Use
Mixed Residential & Commercial
Registered Owner
Quick facts
- How many units does this building have?
- 43 residential units and 7 commercial spaces.
- How tall is this building?
- 6 stories, non-fireproof construction, built in 1940.
- How big is the lot?
- 12,488 sq ft (99.92 ft × 125 ft).
- What's the building class?
- Class D7 — Elevator apt.
- How many buildings are on this lot?
- 1 building on the lot.
Overall Outlook
Long-term signal for residential or commercial viability
Elevated Risk
Maintenance Reliability
Multiple open violations — proceed with caution
20 / 100
Safety
Moderate activity — typical urban
72 / 100
Daily Life
Transit access via 145 St (1)
~2 min subway
Violations & Maintenance History
HPD · DOB · OATH — 36 open, 28 resolved
Tip: this building has 43 residential units and 36 open violations across all of them. To see only the records affecting your apartment, run a new search with your unit number (e.g. 5A or PH2) in the APT / UNIT field on the homepage.
Open Issues — 36
Minor
§ 27-2026, 2027 HMC: properly repair the source and abate the evidence of a water leak ceiling
Apt 45 · 4th floor · 1st apartment from east at south
HPD · Filed Nov 2025 · Open ·
Minor
Properly repair or replace the broken or defective counter balance at lower stash window
§ 27-2005 HMCApt 45 · 4th floor · 1st apartment from east at south
HPD · Filed Nov 2025 · Open ·
Minor
Refit door frame damage
§ 27-2005 HMCApt 45 · 4th floor · 1st apartment from east at south
HPD · Filed Nov 2025 · Open ·
Minor
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling
§ 27-2005 ADM CODEApt 45 · 4th floor · 1st apartment from east at south
HPD · Filed Nov 2025 · Open ·
Minor
§ 27-2026, 2027 HMC: properly repair the source and abate the evidence of a water leak at ceiling
Apt 45 · 4th floor · 1st apartment from east at south
HPD · Filed Oct 2025 · Open ·
+ 31 more open records
Resolved History — 28 (showing 3)
Closed
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( c) mdl and 28 rcny §25-171: replace or repair the self-closing doors that is missing or defective latchset at fire door leading to east yard 1st story public hall at public hall, 1st story
HPD · Filed Nov 2025 · Closed
Closed
At time of inspection of 6 story building with sidewalk shed in place not maintained per code 1. Panels blew off in wind 2. Not tight to facade 3. Metal not secured falling to street all causing hazardous condi
OATH · Filed Oct 2025 · Closed
Closed
Note: at time of inspection, I observed sidewalk shed erected at exposure# 1 & 2 with missing bolt caps and deteriorated/broken mudsills throughout providing inadequate support to vertical beams compromising th
OATH · Filed Aug 2025 · Closed
+ 25 older resolved records