Get the same due-diligence a paralegal charges $400+ for — instantly, $14.99. Refund if the report fails to generate or upstream NYC data was retracted (policy).
Free preview — Pro unlocks: owner of record · mortgage details · fine amounts · permit costs · school ratings · neighborhood demographicsUnlock full report →
Key Findings
2 items
CRIT97 open violations on record· DOB · HPD
INFOAnnual property tax estimated at ~$21,174 (Tax Class 4)· NYC DOF
Building Details
✓ Verified · PLUTO
Building Area
3,705 sf
Commercial Area
3,705 sf
Zoning
R6 · C2-4 overlay
Basement
0
Land Use
Commercial & Office
Registered Owner
Clarke Vida
Quick facts
How many units does this building have?
0 residential units and 1 commercial space.
How tall is this building?
2 stories, non-fireproof construction, built in 1930.
How big is the lot?
2,280 sq ft (28.42 ft × 80.25 ft).
What's the building class?
Class K2 — Retail.
How many buildings are on this lot?
1 building on the lot.
Overall Outlook
Long-term signal for residential or commercial viability
Elevated Risk
Maintenance Reliability
Multiple open violations — proceed with caution
26 / 100
Safety
Moderate activity — typical urban
60 / 100
Daily Life
Transit access via 225 St (2 5)
~3 min subway
Violations & Maintenance History
HPD · DOB · OATH — 45 open, 5 resolved
Open Issues — 45
Minor
Owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
§27-2107 ADM CODE
HPD · Filed Nov 2025 · Open ·
Minor
In. Code: properly repair with similar material the broken or defective fire retardent material at ceiling north, east and south wall at vestibule , 1st story
§ 27-2005 ADM
HPD · Filed Sep 2025 · Open ·
Minor
In code: provide adequate lighting for light fixture at ceiling at public hall, 1st story
§ 27-2038 ADM
HPD · Filed Sep 2025 · Open ·
Critical
§ 27-2005, 2006, 2037 HMC: properly repair and abate unsafe electric wiring condition consisting of at ceiling at vestibule at public hall, 1st story
HPD · Filed Sep 2025 · Open
Minor
In. Code: properly repair with similar material the broken or defective cracked and erroded wood beam at at ceiling at vestibule , 1st story
§ 27-2005 ADM
HPD · Filed Sep 2025 · Open ·
+ 40 more open records
Resolved History — 5 (showing 3)
Closed
Properly repair or replace the broken or defective door frame at north wall at vestibule to 1st story public hall , 1st story
§ 27-2005 HMC
HPD · Filed Sep 2025 · Closed ·
Closed
In. Code: repair the roof so that it will not leak over ceiling
§ 27-2005 ADMApt 1F · 2nd floor · 3rd room from north at west · 1st apartment from south at west
HPD · Filed Mar 2025 · Closed ·
Closed
In. Code: repair the broken or defective plastered surfaces and paint in uniform color the ceiling and north wall
§ 27-2005 ADMApt 1F · 2nd floor · 3rd room from east at south · 1st apartment from south at west