Get the same due-diligence a paralegal charges $400+ for — instantly, $14.99. Refund if the report fails to generate or upstream NYC data was retracted (policy).
Free preview — Pro unlocks: owner of record · mortgage details · fine amounts · permit costs · school ratings · neighborhood demographicsUnlock full report →
Key Findings
3 items
CRIT146 open violations on record· DOB · HPD
INFOAnnual property tax estimated at ~$342,084 (Tax Class 2)· NYC DOF
INFOMost recent mortgage: $883,711 from NATIONAL COOPERATIVE BANK, N.A. in 2023 (+2 more on Financials)· ACRIS
Building Details
✓ Verified · PLUTO
Building Area
55,272 sf
Zoning
R7B
Basement
0
Land Use
Multi-Family Elevator Buildings
Registered Owner
402 Bay Ridge Owners CORP
Quick facts
How many units does this building have?
58 residential units.
How tall is this building?
6 stories, non-fireproof construction, built in 1925.
How big is the lot?
13,100 sq ft (107.17 ft × 123.67 ft).
What's the building class?
Class D4 — Elevator apt.
How many buildings are on this lot?
1 building on the lot.
Overall Outlook
Long-term signal for residential or commercial viability
Elevated Risk
Maintenance Reliability
Multiple open violations — proceed with caution
20 / 100
Safety
Moderate activity — typical urban
79 / 100
Daily Life
Transit access via 77 St (R)
~1 min subway
Violations & Maintenance History
HPD · DOB · OATH — 34 open, 17 resolved
Tip: this building has 58 residential units and 34 open violations across all of them. To see only the records affecting your apartment, run a new search with your unit number (e.g. 5A or PH2) in the APT / UNIT field on the homepage.
Open Issues — 34
Minor
Repair the roof so that it will not leak over ceiling
§ 27-2005 ADM CODEApt 63 · 6th floor · 2nd room from north · 2nd apartment from west at north
HPD · Filed Apr 2026 · Open ·
Minor
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling
§ 27-2005 ADM CODEApt 63 · 6th floor · 2nd apartment from west at north
HPD · Filed Apr 2026 · Open ·
Minor
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling
§ 27-2005 ADM CODEApt 63 · 6th floor · 2nd room from north · 2nd apartment from west at north
HPD · Filed Apr 2026 · Open ·
Minor
§ 27-2017.3 HMC: trace and repair the source and abate the visible mold condition... Less than 10 sq ft at ceiling
Apt 63 · 6th floor · 2nd apartment from west at north
HPD · Filed Apr 2026 · Open ·
Minor
Repair the roof so that it will not leak over ceiling
§ 27-2005 ADM CODEApt 63 · 6th floor · 2nd apartment from west at north
HPD · Filed Apr 2026 · Open ·
+ 29 more open records
Resolved History — 17 (showing 3)
Closed
For floor in 1C. Failure to comply with the commissioner's order contained in summon/violation #39093899X issued 8/31/2023 and to file a certificate of correction pursuant to 28-201.1 and rcny 102-01. Remedy: c
OATH · Filed Apr 2025 · Closed
Closed
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( c) mdl and 28 rcny §25-171: replace or repair the self-closing doors that is missing or defective entrance door to building (door frame) , 1st story
HPD · Filed Nov 2024 · Closed
Closed
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( c) mdl and 28 rcny §25-171: replace or repair the self-closing doors that is missing or defective hinges at the front entrance to building,,