Get the same due-diligence a paralegal charges $400+ for — instantly, $14.99. Refund if the report fails to generate or upstream NYC data was retracted (policy).
Free preview — Pro unlocks: owner of record · mortgage details · fine amounts · permit costs · school ratings · neighborhood demographicsUnlock full report →
Key Findings
3 items
CRIT107 open violations on record· DOB · HPD
INFOAnnual property tax estimated at ~$91,634 (Tax Class 2)· NYC DOF
INFOMost recent mortgage: $800,000 from HABIB AMERICAN BANK in 2023· ACRIS
Building Details
✓ Verified · PLUTO
Building Area
22,430 sf
Zoning
R6A
Basement
0
Land Use
Multi-Family Walk-Up Buildings
Registered Owner
Rafael Rlty CORP
Quick facts
How many units does this building have?
28 residential units.
How tall is this building?
5 stories, non-fireproof construction, built in 1914.
How big is the lot?
5,000 sq ft (50 ft × 100 ft).
What's the building class?
Class C1 — Walk-up apt.
How many buildings are on this lot?
1 building on the lot.
Overall Outlook
Long-term signal for residential or commercial viability
Elevated Risk
Maintenance Reliability
Multiple open violations — proceed with caution
20 / 100
Safety
Moderate activity — typical urban
64 / 100
Daily Life
Transit access via 182-183 Sts (B D)
~7 min subway
Violations & Maintenance History
HPD · DOB · OATH — 36 open, 14 resolved
Tip: this building has 28 residential units and 36 open violations across all of them. To see only the records affecting your apartment, run a new search with your unit number (e.g. 5A or PH2) in the APT / UNIT field on the homepage.
Open Issues — 36
Critical
§ 27-2056.7, 27-2056.17 and 27-2056.8 ADM code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at bsmt-apt bsmtw, 1st bsmt-apt from west at north
HPD · Filed Mar 2026 · Open
Critical
§ 27-2056.7, 27-2056.17 and 27-2056.8 ADM code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment
Apt V · 5th floor · 1st apartment from north at east
HPD · Filed Mar 2026 · Open ·
Critical
§ 27-2056.7, 27-2056.17 and 27-2056.8 ADM code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment
Apt C · 1st floor · 1st apartment from west at north
HPD · Filed Mar 2026 · Open ·
Critical
§ 27-2056.4 ADM code- correct failure to notify occupants and/or to investigate lead-based paint hazards.
HPD · Filed Dec 2025 · Open
Minor
§ 27-2056.4(h) and 27-2056.17 ADM code -correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities.
HPD · Filed Dec 2025 · Open
+ 31 more open records
Resolved History — 14 (showing 3)
Closed
Properly repair or replace the broken or defective cracked glass at 1st pane from east above door at transom at building front entrance at public hall
§ 27-2005 HMC
HPD · Filed Nov 2025 · Closed ·
Closed
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( c) mdl and 28 rcny §25-171: replace or repair the self-closing doors that is missing or defective [latch] door from street to basement at public hall
HPD · Filed Nov 2025 · Closed
Closed
(a) § HMC: file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPD s website, www. NYC. Gov\hpd, search bed bugs.