Open Violations
—
DOB + HPD
Unpaid Fines
—
OATH / ECB
Flood Zone
—
FEMA designation
Safety Score
—
Composite index
Get the same due-diligence a paralegal charges $400+ for — instantly, $14.99. Refund if the report fails to generate or upstream NYC data was retracted (policy).
Free preview — Pro unlocks: owner of record · mortgage details · fine amounts · permit costs · school ratings · neighborhood demographics Unlock full report →
1 item
CRIT17 open violations on record· DOB · HPD
PLUTO unavailable
Year Built
—
Floors
—
Residential Units
—
Lot Area
—
Building Area
—
Construction
—
Overall Outlook
Insufficient data — see verdict above
—
Maintenance Reliability
Insufficient data — see verdict above
—
Safety
Neighborhood data unavailable
—
Daily Life
Transit access via 155 St (C)
~3 min subway
Violations & Maintenance History
HPD · DOB · OATH — 17 open, 49 resolved
Open Issues — 17
Minor
Atoi on an active jobsite, 1st fl APT:#4, observed electrical work being done throughout the entire premises. Upon reviewing. And doing a search on bis/dob now reveal to me that no permit was issued for electric
OATH · Filed Oct 2025 · Open
Minor
Cracked, spalled, and displaced brick and parapet walls with open mortar joints and delaminated stucco exposing corroded metal. Terra-cotta coping cracked and defaced; chimney warping &leaning stack with missin
OATH · Filed Oct 2025 · Open
Minor
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( c) mdl and 28 rcny §25-171: replace or repair the self-closing doors that is missing or defective hinge
Apt 51 · 5th floor · 2nd apartment from west at north
HPD · Filed Dec 2024 · Open ·
Minor
Properly repair the broken or defective paving at floor at south at basement
§ 27-2005 ADM CODE
HPD · Filed Oct 2018 · Open ·
Minor
In. Code: abate the nuisance consisting of bedbugs
§ 27-2018 ADMApt 21 · 2nd floor · 2nd apartment from west at north
HPD · Filed May 2018 · Open ·
+ 12 more open records
Resolved History — 49 (showing 3)
Closed
Observed asbestos abatement and demolition in progress at occupied 6-story building. Containment enclosure lacked proper labeling, clearance signage, and secured barriers. No dep permit or certification posted
OATH · Filed Oct 2025 · Closed
Closed
Atoi on an active jobsite of a #5 story building at roof location construction work was in progress. Upon request for approved plans, none was provided. More than 30 minutes none was provided. Gc/foremen unable
OATH · Filed Oct 2025 · Closed
Closed
Observed inadequate housekeeping at construction site. At roof location debris, discarded materials, insulation boards, garbage bags, and construction waste tools scattered throughout roof and work areas. No org
OATH · Filed Oct 2025 · Closed
+ 46 older resolved records