Open Violations
158
DOB + HPD
Unpaid Fines
$0
OATH / ECB
Flood Zone
X
FEMA designation
Safety Score
57
Composite index
Get the same due-diligence a paralegal charges $400+ for — instantly, $14.99. Refund if the report fails to generate or upstream NYC data was retracted (policy).
Free preview — Pro unlocks: owner of record · mortgage details · fine amounts · permit costs · school ratings · neighborhood demographics Unlock full report →
3 items
CRIT158 open violations on record· DOB · HPD
INFOAnnual property tax estimated at ~$311,612 (Tax Class 2)· NYC DOF
INFOMost recent mortgage: $16,189,000 from GREYSTONE SERVICING COMPANY LLC in 2020· ACRIS
✓ Verified · PLUTO
Building Area
65,370 sf
Zoning
R7A
Basement
Partial Basement
Land Use
Multi-Family Elevator Buildings
Registered Owner
Quick facts
- How many units does this building have?
- 73 residential units.
- How tall is this building?
- 6 stories, non-fireproof construction, built in 1927.
- How big is the lot?
- 16,000 sq ft (160 ft × 100 ft).
- What's the building class?
- Class D1 — Elevator apt.
- How many buildings are on this lot?
- 1 building on the lot.
Overall Outlook
Long-term signal for residential or commercial viability
Elevated Risk
Maintenance Reliability
Multiple open violations — proceed with caution
20 / 100
Safety
Elevated activity — consider before signing
57 / 100
Daily Life
Transit access via Church Av (B Q)
~1 min subway
Violations & Maintenance History
HPD · DOB · OATH — 50 open, 0 resolved
Tip: this building has 73 residential units and 50 open violations across all of them. To see only the records affecting your apartment, run a new search with your unit number (e.g. 5A or PH2) in the APT / UNIT field on the homepage.
Open Issues — 50
Minor
§27-2104(b) HMC post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the building s entrance. For more information about signage requirements, please visit: https://www. NYC. Gov/site/hpd/services-and-information/required-signage. Page
HPD · Filed Apr 2026 · Open
Minor
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall
§ 27-2005 ADM CODEApt E3 · 5th floor
HPD · Filed Apr 2026 · Open ·
Minor
Paint metal in accordance with DEPT. Regulation the 1st riser from south at west wall
§ 27-2005 ADM CODEApt E3 · 5th floor · 1st room from north at center
HPD · Filed Apr 2026 · Open ·
Minor
§ 27-2017.3 HMC: trace and repair the source and abate the visible mold condition... At less than 10 sqft east wall
Apt E3 · 5th floor
HPD · Filed Apr 2026 · Open ·
Minor
Repair the broken or defective plastered surfaces and paint in a uniform color the south wall
§ 27-2005 ADM CODEApt E3 · 5th floor
HPD · Filed Apr 2026 · Open ·
+ 45 more open records