Open Violations
—
DOB + HPD
Unpaid Fines
—
OATH / ECB
Flood Zone
—
FEMA designation
Safety Score
—
Composite index
Get the same due-diligence a paralegal charges $400+ for — instantly, $14.99. Refund if the report fails to generate or upstream NYC data was retracted (policy).
Free preview — Pro unlocks: owner of record · mortgage details · fine amounts · permit costs · school ratings · neighborhood demographics Unlock full report →
2 items
CRIT6 open violations on record· DOB · HPD
INFOAnnual property tax estimated at ~$75,184 (Tax Class 2)· NYC DOF
PLUTO unavailable
Year Built
—
Floors
—
Residential Units
—
Lot Area
—
Building Area
—
Construction
—
Zoning
C4-3A
Land Use
Mixed Residential & Commercial
Quick facts
- What's the building class?
- Class S9 — Mixed-use.
Overall Outlook
Insufficient data — see verdict above
—
Maintenance Reliability
Insufficient data — see verdict above
—
Safety
Neighborhood data unavailable
—
Daily Life
Transit access via 53 St (R)
~4 min subway
Violations & Maintenance History
HPD · DOB · OATH — 6 open, 2 resolved
Open Issues — 6
Minor
At the time of my inspection of a 3 story building, I observed sidewalk shed in place at exposure #1 and 4 with a valid permit expiration date 04-18-2026 and with the fallowing objection inoperable light bulbs.
OATH · Filed Mar 2026 · Open
Minor
Work does not conform to approved construction documents and/or approved amendments. Sidewalk shed has pipe scaffolding above which is contrary to plans stated on job #b01223072-i1-sh, conform work to approved
OATH · Filed Oct 2025 · Open
Minor
Failure to maintain building in code compliant manner. At exposure 1 at 51st street their are major step cracks in facade wall in between the 2nd and 3rd floor., repair and/replace
OATH · Filed Oct 2025 · Open
Minor
Work without a permit. Pipe scaffolding exceeds over 40' which requires work permit., obtain permit
OATH · Filed Oct 2025 · Open
Minor
Atoi observed at APT 1A removal of lath and plaster in living room area interior walls apx 20x6 feet also removal of fire stopping material in ceiling between apartment 1A and 2A. No change to partitions, elect
OATH · Filed May 2025 · Open
+ 1 more open record
Resolved History — 2
Closed
At time of inspection in response to complaint I observed underside of sidewalk shed a not illuminated as per 3307.6.4.8. This creates a hazardous condition for public walking underneath while dark and not bein
OATH · Filed Feb 2026 · Closed
Closed
Failure to safeguard all persons and properly affected by constructionoperations. At time of inspection I observed fire escape opening in sidewalk shed obstructed with wood board blocking fire escape ladder fro
OATH · Filed Oct 2024 · Closed