Open Violations
—
DOB + HPD
Unpaid Fines
—
OATH / ECB
Flood Zone
—
FEMA designation
Safety Score
—
Composite index
Get the same due-diligence a paralegal charges $400+ for — instantly, $14.99. Refund if the report fails to generate or upstream NYC data was retracted (policy).
Free preview — Pro unlocks: owner of record · mortgage details · fine amounts · permit costs · school ratings · neighborhood demographics Unlock full report →
1 item
CRIT318 open violations on record· DOB · HPD
PLUTO unavailable
Year Built
—
Floors
—
Residential Units
—
Lot Area
—
Building Area
—
Construction
—
Overall Outlook
Insufficient data — see verdict above
—
Maintenance Reliability
Insufficient data — see verdict above
—
Safety
Neighborhood data unavailable
—
Daily Life
Transit access via Stapleton (SIR)
~7 min subway
Violations & Maintenance History
HPD · DOB · OATH — 46 open, 8 resolved
Open Issues — 46
Minor
The canopy roof over front entry is collapsing from rotten wood members and supports. The brick chimney at exposure 2 is crumbling with bricks falling to alleyway below, repair and/replace; repair and make safe
OATH · Filed Oct 2025 · Open
Minor
Work without a permit. At time of inspection observed a vertical rear extension at rear of property. Observed a siding structure for 1FL with interior of 1FL 100% completed. Upon inspection no permits were issu
OATH · Filed Sep 2025 · Open
Minor
Failure to maintain building in a code compliant manner. At time of inspection observed a canopy at front porch in disrepair with potential of further collapsing. Observed rotted wood debris and wood debris at
OATH · Filed Sep 2025 · Open
Minor
In. Code: properly repair with similar material the broken or defective wood frame around roof at stoop
§ 27-2005 ADM
HPD · Filed Aug 2025 · Open ·
Minor
In. Code: properly secure the loose metal handrails north and south at stoop
§ 27-2005 ADM
HPD · Filed Aug 2025 · Open ·
+ 41 more open records
Resolved History — 8 (showing 3)
Closed
In. Code: repair the roof so that it will not leak over the ceiling
§ 27-2005 ADMApt 1 · 1st floor · 5th room from east · 1st apartment from east at south
HPD · Filed May 2025 · Closed ·
Closed
In. Code: repair the broken or defective plastered surfaces and paint in uniform color the ceiling
§ 27-2005 ADMApt 1 · 1st floor · 5th room from east · 1st apartment from east at south
HPD · Filed May 2025 · Closed ·
Closed
In. Code: repair the broken or defective plastered surfaces and paint in uniform color at ceiling
§ 27-2005 ADMApt 1 · 1st floor · 4th room from east · 1st apartment from east at south
HPD · Filed May 2025 · Closed ·
+ 5 older resolved records