Open Violations
—
DOB + HPD
Unpaid Fines
—
OATH / ECB
Flood Zone
—
FEMA designation
Safety Score
—
Composite index
Get the same due-diligence a paralegal charges $400+ for — instantly, $14.99. Refund if the report fails to generate or upstream NYC data was retracted (policy).
Free preview — Pro unlocks: owner of record · mortgage details · fine amounts · permit costs · school ratings · neighborhood demographics Unlock full report →
1 item
CRIT331 open violations on record· DOB · HPD
PLUTO unavailable
Year Built
—
Floors
—
Residential Units
—
Lot Area
—
Building Area
—
Construction
—
Overall Outlook
Insufficient data — see verdict above
—
Maintenance Reliability
Insufficient data — see verdict above
—
Safety
Neighborhood data unavailable
—
Daily Life
Transit access via Bay Pkwy (D)
~6 min subway
Violations & Maintenance History
HPD · DOB · OATH — 59 open, 2 resolved
Open Issues — 59
Minor
Properly repair or replace the broken or defective door
§ 27-2005 HMCApt C34 · 3rd floor
HPD · Filed May 2026 · Open ·
Minor
Replace with new the missing escutcheon plate at heat riser at ceiling and at floor
§ 27-2005 ADM CODEApt C34 · 3rd floor
HPD · Filed May 2026 · Open ·
Minor
(a) § HMC: file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPD s website, www. NYC. Gov\hpd, search bed bugs.
HPD · Filed May 2026 · Open
Minor
§ 27-2005, 2007 ADM code remove all encumbrances consisting of bycycles. Baby stroller, shoping cart at public hall, 2nd story
HPD · Filed Apr 2026 · Open
Critical
At time of inspection, observed debris at exposure 3 over door/entry in car parking area. Cracks on facades between brick masonry and plaster creating unsafe environment. ECB issued as conditions poses severe s
OATH · Filed Apr 2026 · Open
+ 54 more open records
Resolved History — 2
Closed
Failure to maintain building in code compliant manner; observed stucco on facade at exp 3 and around rear court yard is damaged and dislodging from building., repair and/replace
OATH · Filed Jun 2025 · Closed
Closed
Work without a permit noted: at time of inspection, observation was made inside of atrium area of premises a erected sidewalk shed approximately 12'-0 in heigh 100'-0 ft in length. Erected sidewalk has no permi
OATH · Filed Jul 2023 · Closed