Get the same due-diligence a paralegal charges $400+ for — instantly, $14.99. Refund if the report fails to generate or upstream NYC data was retracted (policy).
Free preview — Pro unlocks: owner of record · mortgage details · fine amounts · permit costs · school ratings · neighborhood demographicsUnlock full report →
Key Findings
3 items
CRIT902 open violations on record· DOB · HPD
INFOAnnual property tax estimated at ~$236,704 (Tax Class 2)· NYC DOF
INFOMost recent mortgage: $1,006,441 from NEW YORK COMMUNITY BANK in 2022 (+4 more on Financials)· ACRIS
Building Details
✓ Verified · PLUTO
Building Area
43,000 sf
Zoning
R4-1
Basement
0
Land Use
Multi-Family Walk-Up Buildings
Registered Owner
8501 Fort Hamilton Parkway LTD
Quick facts
How many units does this building have?
51 residential units.
How tall is this building?
4 stories, non-fireproof construction, built in 1927.
How big is the lot?
18,150 sq ft (101.58 ft × 155.5 ft).
What's the building class?
Class C1 — Walk-up apt.
How many buildings are on this lot?
1 building on the lot.
Overall Outlook
Long-term signal for residential or commercial viability
Elevated Risk
Maintenance Reliability
Multiple open violations — proceed with caution
20 / 100
Safety
Moderate activity — typical urban
73 / 100
Daily Life
Transit access via 86 St (R)
~6 min subway
Violations & Maintenance History
HPD · DOB · OATH — 54 open, 0 resolved
Tip: this building has 51 residential units and 54 open violations across all of them. To see only the records affecting your apartment, run a new search with your unit number (e.g. 5A or PH2) in the APT / UNIT field on the homepage.
Open Issues — 54
Minor
567 (c) § 27-2017, 27-2017.1, 27-2017.4, 27-2017.5, 27-2017.8, 27-2019, 27-2021 HMC: abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. Evidence found at rats at front areaway at north
HPD · Filed May 2026 · Open
Minor
Failure to maintain building in code-compliant manner. Vio#39152267p , observied at court yard and exp#1 &exp#2 ac units still in windows at multiple locations without proper aproved brackets., repair and/or rep
OATH · Filed May 2026 · Open
Minor
§ 27-2010, 2011, 2012 ADM code remove the accumulation of refuse and/or rubbish and maintain in a clean condition the garbage at building front yard, 1st story
HPD · Filed May 2026 · Open
Minor
(a) § HMC: file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPD s website, www. NYC. Gov\hpd, search bed bugs.
HPD · Filed May 2026 · Open
Minor
Paint with light colored paint at ceiling and all walls at bulkhead , section at west