Get the same due-diligence a paralegal charges $400+ for — instantly, $14.99. Refund if the report fails to generate or upstream NYC data was retracted (policy).
Free preview — Pro unlocks: owner of record · mortgage details · fine amounts · permit costs · school ratings · neighborhood demographicsUnlock full report →
Key Findings
4 items
CRIT173 open violations on record· DOB · HPD
INFOAnnual property tax estimated at ~$60,998 (Tax Class 2)· NYC DOF
INFOLast sold for $608,894 in October 2013· ACRIS
INFOMost recent mortgage: $1,381,763 from PCSB BANK in 2020 (+3 more on Financials)· ACRIS
Building Details
✓ Verified · PLUTO
Building Area
5,464 sf
Zoning
R7-1 / M1-5
Basement
Converted
Land Use
Multi-Family Walk-Up Buildings
Registered Owner
Global Heights Apartments INC
Quick facts
How many units does this building have?
8 residential units.
How tall is this building?
4 stories, built in 2014.
How big is the lot?
2,306 sq ft (23.75 ft × 98.37 ft).
What's the building class?
Class C1 — Walk-up apt.
How many buildings are on this lot?
1 building on the lot.
Overall Outlook
Long-term signal for residential or commercial viability
Elevated Risk
Maintenance Reliability
Multiple open violations — proceed with caution
20 / 100
Safety
Moderate activity — typical urban
63 / 100
Daily Life
Transit access via 155 St (B D)
~8 min subway
Violations & Maintenance History
HPD · DOB · OATH — 41 open, 9 resolved
Tip: this building has 8 residential units and 41 open violations across all of them. To see only the records affecting your apartment, run a new search with your unit number (e.g. 5A or PH2) in the APT / UNIT field on the homepage.
Open Issues — 41
Minor
Properly repair or replace the broken or defective latch and assembly at door to public hall stairs at public hall stairs, 1st story
§ 27-2005 HMC
HPD · Filed Oct 2025 · Open ·
Minor
§ 27-2005, 2007 ADM code remove all encumbrances consisting of furniture at intermediate landing at public hall stairs, 4th story
HPD · Filed Oct 2025 · Open
Minor
Properly repair or replace the broken or defective lock and assembly at street entrance door to public hall , 1st story
§ 27-2005 HMC
HPD · Filed Oct 2025 · Open ·
Minor
§ 27-2017.3 HMC: trace and repair the source and abate the visible mold condition... Greater than 10SQ ft at ceiling and all walls
Apt 4B · 4th floor · 1st apartment from south at west
HPD · Filed Sep 2025 · Open ·
Minor
Properly repair or replace the broken or defective latch and assembly at roof entrance door from roof to public hall 4th story at 1st public hall bulkhead from north, 4th story
§ 27-2005 HMC
HPD · Filed Sep 2025 · Open ·
+ 36 more open records
Resolved History — 9 (showing 3)
Closed
Abate the nuisance consisting of refrigerator with doors intact at 4th story intermediate landing at public hall, 4th story
§ 27-2005 ADM CODE & 309 M/D LAW
HPD · Filed Sep 2025 · Closed ·
Closed
Paint with light colored paint at ceilings and all walls at all stories at public hall stairs
§ 27-2013 ADM CODE
HPD · Filed Sep 2025 · Closed ·
Closed
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling
§ 27-2005 ADM CODEApt 4B · 4th floor · 3rd room from east at south · 1st apartment from south at west