Open Violations
138
DOB + HPD
Unpaid Fines
$0
OATH / ECB
Flood Zone
X
FEMA designation
Safety Score
76
Composite index
Get the same due-diligence a paralegal charges $400+ for — instantly, $14.99. Refund if the report fails to generate or upstream NYC data was retracted (policy).
Free preview — Pro unlocks: owner of record · mortgage details · fine amounts · permit costs · school ratings · neighborhood demographics Unlock full report →
1 item
CRIT138 open violations on record· DOB · HPD
✓ Verified · PLUTO
Building Area
145,728 sf
Zoning
R8
Basement
0
Land Use
Multi-Family Elevator Buildings
Registered Owner
Quick facts
- How many units does this building have?
- 108 residential units.
- How tall is this building?
- 6 stories, non-fireproof construction, built in 1927.
- How big is the lot?
- 39,250 sq ft (213.64 ft × 182.77 ft).
- What's the building class?
- Class D4 — Elevator apt.
- How many buildings are on this lot?
- 1 building on the lot.
Overall Outlook
Long-term signal for residential or commercial viability
Stable — Review Maintenance
Maintenance Reliability
Multiple open violations — proceed with caution
70 / 100
Safety
Moderate activity — typical urban
76 / 100
Daily Life
Transit access via 161 St-Yankee Stadium (B D)
~5 min subway
Violations & Maintenance History
HPD · DOB · OATH — 12 open, 38 resolved
Open Issues — 12
Minor
§ 27-2045(b)(1)(a) HMC, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations inoperable
Apt 1N · 1st floor · 1st apartment from north at east
HPD · Filed Dec 2025 · Open ·
Critical
§ 27-2056.6 ADM code - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling, north wall, south wall, east wall
Apt 1N · 1st floor · 1st apartment from north at east
HPD · Filed Dec 2025 · Open ·
Critical
§ 27-2056.6 ADM code - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at south wall, 1st closet from west at north wall door, 1st closet from west at north wall door frame, south wall, east wall, west wall
Apt 1N · 1st floor · 1st apartment from north at east
HPD · Filed Dec 2025 · Open ·
Minor
Paint with light colored paint at ceiling
§ 27-2013 ADM CODEApt 1N · 1st floor · 1st apartment from north at east
HPD · Filed Dec 2025 · Open ·
Minor
§ 27-2045(b)(1)(b) HMC, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules inoperable
Apt 1N · 1st floor · 1st apartment from north at east
HPD · Filed Dec 2025 · Open ·
+ 7 more open records
Resolved History — 38 (showing 3)
Closed
§ 27-2043.1 HMC install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. Wg to install = 2, wg to replace = 0, wg to repair = 0
Apt 1N · 1st floor · 1st apartment from north at east
HPD · Filed Dec 2025 · Closed ·
Closed
HMC ADM code: § 27-2017.4 abate the infestation consisting of roaches
Apt 2D · 2nd floor · 1st apartment from south at west
HPD · Filed Oct 2025 · Closed ·
Closed
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling, north and east walls
§ 27-2005 ADM CODEApt 2D · 2nd floor · 1st apartment from south at west
HPD · Filed Oct 2025 · Closed ·
+ 35 older resolved records