Skip to main content
New search

Property Audit Report

975 Walton Avenue

Caution — Review Before Signing
BBL 2024760022Type Elevator aptGenerated May 24, 2026View on Google Maps

Open Violations

261

DOB + HPD

Unpaid Fines

$41k

OATH / ECB

Flood Zone

X

FEMA designation

Safety Score

79

Composite index

Unlock the full 15-page report — $14.99

Get the same due-diligence a paralegal charges $400+ for — instantly, $14.99. Refund if the report fails to generate or upstream NYC data was retracted (policy).

Free previewPro unlocks: owner of record · mortgage details · fine amounts · permit costs · school ratings · neighborhood demographics Unlock full report
Key Findings
4 items
CRIT261 open violations on record· DOB · HPD
INFOAnnual property tax estimated at ~$524,469 (Tax Class 2)· NYC DOF
INFOLast sold for $18,000,000 in December 2023· ACRIS
INFOMost recent mortgage: $13,410,749 from MCCORMICK 101, LLC in 2023 (+6 more on Financials)· ACRIS
Building Details
✓ Verified · PLUTO
Building Area
279,000 sf
Commercial Area
1,000 sf
Zoning
R8
Basement
Full Basement
Land Use
Mixed Residential & Commercial
Registered Owner
Quick facts
How many units does this building have?
182 residential units and 3 commercial spaces.
How tall is this building?
6 stories, non-fireproof construction, built in 1930.
How big is the lot?
58,182 sq ft (290.91 ft × 200 ft).
What's the building class?
Class D7 — Elevator apt.
How many buildings are on this lot?
1 building on the lot.
Overall Outlook
Long-term signal for residential or commercial viability
Elevated Risk
Maintenance Reliability
Multiple open violations — proceed with caution
20 / 100
Safety
Moderate activity — typical urban
79 / 100
Daily Life
Transit access via 161 St-Yankee Stadium (B D)
~4 min subway
Violations & Maintenance History
HPD · DOB · OATH28 open, 40 resolved
Tip: this building has 182 residential units and 28 open violations across all of them. To see only the records affecting your apartment, run a new search with your unit number (e.g. 5A or PH2) in the APT / UNIT field on the homepage.
Open Issues — 28
Minor
Repair the broken or defective plastered surfaces and paint in a uniform color at all walls
§ 27-2005 ADM CODEApt 4CN · 4th floor · 3rd apartment from west at north
HPD · Filed Apr 2026 · Open ·
Minor
Properly repair or replace the broken or defective broken glass at upper sash
§ 27-2005 HMCApt 3PN · 3rd floor · 3rd room from north
HPD · Filed Apr 2026 · Open ·
Minor
HMC ADM code: § 27-2017.4 abate the infestation consisting of roaches
Apt 4CN · 4th floor · 3rd apartment from west at north
HPD · Filed Apr 2026 · Open ·
Minor
§ 27-2017.3 HMC: trace and repair the source and abate the visible mold condition... 30 sqft at all walls
Apt 4CN · 4th floor · 3rd apartment from west at north
HPD · Filed Apr 2026 · Open ·
Minor
Refit door
§ 27-2005 HMCApt 3PN · 3rd floor · 2nd room from north
HPD · Filed Apr 2026 · Open ·
+ 23 more open records
Resolved History — 40 (showing 3)
Closed
Provide hot water at all hot water fixtures
§ 27-2031 ADM CODEApt 2KS · 2nd floor
HPD · Filed Feb 2026 · Closed ·
Closed
Provide missing (light switch cover) at south wall
§ 27-2005 ADM CODEApt 2KS · 2nd floor
HPD · Filed Feb 2026 · Closed ·
Closed
Repair the broken or defective plastered surfaces and paint in a uniform color south wall
§ 27-2005 ADM CODEApt 2KS · 2nd floor · 1st room from east
HPD · Filed Feb 2026 · Closed ·
+ 37 older resolved records