Get the same due-diligence a paralegal charges $400+ for — instantly, $14.99. Refund if the report fails to generate or upstream NYC data was retracted (policy).
Free preview — Pro unlocks: owner of record · mortgage details · fine amounts · permit costs · school ratings · neighborhood demographicsUnlock full report →
Key Findings
4 items
CRIT673 open violations on record· DOB · HPD
INFOAnnual property tax estimated at ~$83,078 (Tax Class 2)· NYC DOF
INFOLast sold for $3,563,259 in November 2024· ACRIS
INFOMost recent mortgage: $966,271 from THE CITY OF NEW YORK in 2005· ACRIS
Building Details
✓ Verified · PLUTO
Building Area
38,000 sf
Zoning
R6B
Basement
Partial Basement
Land Use
Multi-Family Walk-Up Buildings
Registered Owner
Greene Avenue Sna Housing Development Fu Nd Corpora
Quick facts
How many units does this building have?
32 residential units.
How tall is this building?
4 stories, non-fireproof construction, built in 1931.
How big is the lot?
12,000 sq ft (100 ft × 120 ft).
What's the building class?
Class C1 — Walk-up apt.
How many buildings are on this lot?
2 buildings on the lot.
Overall Outlook
Long-term signal for residential or commercial viability
Elevated Risk
Maintenance Reliability
Multiple open violations — proceed with caution
20 / 100
Safety
Moderate activity — typical urban
71 / 100
Daily Life
Transit access via Kosciuszko St (J)
~4 min subway
Violations & Maintenance History
HPD · DOB · OATH — 59 open, 0 resolved
Tip: this building has 32 residential units and 59 open violations across all of them. To see only the records affecting your apartment, run a new search with your unit number (e.g. 5A or PH2) in the APT / UNIT field on the homepage.
Open Issues — 59
Minor
HMC ADM code: § 27-2017.4 abate the infestation consisting of roaches
Apt 1D · 1st floor · 1st apartment from east at south
HPD · Filed May 2026 · Open ·
Minor
§ 27-2017.3 HMC: trace and repair the source and abate the visible mold condition... Less than 10 sq ft at all walls and ceiling
Apt 1D · 1st floor · 1st apartment from east at south
HPD · Filed May 2026 · Open ·
Minor
§ 27-2017.3 HMC: trace and repair the source and abate the visible mold condition... Greater than 10 sq ft at north wall, west wall and ceiling
Apt 1D · 1st floor · 1st apartment from east at south
HPD · Filed May 2026 · Open ·
Minor
§ 27-2045(b)(1)(b) HMC, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing
Apt 1D · 1st floor · 1st apartment from east at south
HPD · Filed May 2026 · Open ·
Minor
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall, west wall and ceiling
§ 27-2005 ADM CODEApt 1D · 1st floor · 1st apartment from east at south