Open Violations
37
DOB + HPD
Unpaid Fines
$0
OATH / ECB
Flood Zone
X
FEMA designation
Safety Score
67
Composite index
Get the same due-diligence a paralegal charges $400+ for — instantly, $14.99. Refund if the report fails to generate or upstream NYC data was retracted (policy).
Free preview — Pro unlocks: owner of record · mortgage details · fine amounts · permit costs · school ratings · neighborhood demographics Unlock full report →
1 item
CRIT37 open violations on record· DOB · HPD
✓ Verified · PLUTO
Building Area
86,000 sf
Zoning
R7-1
Basement
0
Land Use
Multi-Family Elevator Buildings
Registered Owner
Quick facts
- How many units does this building have?
- 78 residential units.
- How tall is this building?
- 6 stories, non-fireproof construction, built in 1928.
- How big is the lot?
- 17,296 sq ft (154 ft × 172.36 ft).
- What's the building class?
- Class D1 — Elevator apt.
- How many buildings are on this lot?
- 1 building on the lot.
Overall Outlook
Long-term signal for residential or commercial viability
Elevated Risk
Maintenance Reliability
Multiple open violations — proceed with caution
20 / 100
Safety
Moderate activity — typical urban
67 / 100
Daily Life
Transit access via 167 St (B D)
~6 min subway
Violations & Maintenance History
HPD · DOB · OATH — 37 open, 22 resolved
Tip: this building has 78 residential units and 37 open violations across all of them. To see only the records affecting your apartment, run a new search with your unit number (e.g. 5A or PH2) in the APT / UNIT field on the homepage.
Open Issues — 37
Minor
§ 27-2026, 2027 HMC: properly repair the source and abate the evidence of a water leak at north wall
Apt 2E · 2nd floor · 2nd apartment from north at east
HPD · Filed Apr 2026 · Open ·
Minor
§ 27-2017.3 HMC: trace and repair the source and abate the visible mold condition... Less than 10 sqft at north wall
Apt 2E · 2nd floor · 2nd apartment from north at east
HPD · Filed Apr 2026 · Open ·
Minor
Repair the broken or defective plastered surfaces and paint in a uniform color north wall
§ 27-2005 ADM CODEApt 2E · 2nd floor · 2nd apartment from north at east
HPD · Filed Apr 2026 · Open ·
Minor
Repair the roof so that it will not leak at ceiling
§ 27-2005 ADM CODEApt 6C · 6th floor
HPD · Filed Apr 2026 · Open ·
Minor
Properly repair or replace the broken or defective shattered glass panel at upper sash, at 2nd window from west at north wall
§ 27-2005 HMCApt 6C · 6th floor · 1st room from east
HPD · Filed Apr 2026 · Open ·
+ 32 more open records
Resolved History — 22 (showing 3)
Closed
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( c) mdl and 28 rcny §25-171: replace or repair the self-closing doors that is missing or defective hinges at west wall entrance door (from roof to public hall staircase) at 1st public hall bulkhead from north, 6th story
HPD · Filed Apr 2026 · Closed
Closed
§ 27-2056.6 ADM code - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling, 1st door frame from north at east wall, north wall, south wall, east wall, west wall
Apt 3L · 3rd floor · 3rd room from east
HPD · Filed Feb 2026 · Closed ·
Closed
§ 27-2056.6 ADM code - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall
Apt 3L · 3rd floor · 2nd room from east at north
HPD · Filed Feb 2026 · Closed ·
+ 19 older resolved records