La misma diligencia que un asistente legal cobra $400+, al instante por $14.99. Reembolso si el informe no se genera o si los datos de NYC fueron retirados (política).
Generando auditoría profesional de la propiedad...
Analizando cumplimiento y estado del edificio...
Auditando el vecindario y el entorno cultural...
Calculando riesgos financieros y penalidades...
Mapeando conectividad de transporte y seguridad...
Vista previa gratis — Pro abre: propietario registrado · detalles de hipoteca · multas · costos de permisos · calificaciones escolares · demografía del vecindarioVer informe completo →
Hallazgos Clave
3 elementos
CRIT107 infracciones abiertas registradas· DOB · HPD
INFOHipoteca más reciente: 800.000 US$ de HABIB AMERICAN BANK en 2023· ACRIS
Detalles del Edificio
✓ Verificado · PLUTO
Superficie del edificio
22.430 sf
Zonificación
R6A
Sótano
0
Uso del suelo
Multi-Family Walk-Up Buildings
Propietario registrado
Rafael Rlty CORP
Datos rápidos
¿Cuántas unidades tiene este edificio?
28 unidades residenciales.
¿Qué tan alto es este edificio?
5 pisos, construcción non-fireproof, construido en 1914.
¿Qué tan grande es el lote?
5000 pies² (50 ft × 100 ft).
¿Cuál es la clase del edificio?
Clase C1 — Walk-up apt.
¿Cuántos edificios hay en este lote?
1 edificio en el lote.
Perspectiva general
Long-term signal for residential or commercial viability
Elevated Risk
Confiabilidad de mantenimiento
Multiple open violations — proceed with caution
20 / 100
Seguridad
Moderate activity — typical urban
64 / 100
Vida diaria
Transit access via 182-183 Sts (B D)
~7 min subway
Violations & Maintenance History
HPD · DOB · OATH — 36 open, 14 resolved
Tip: this building has 28 residential units and 36 open violations across all of them. To see only the records affecting your apartment, run a new search with your unit number (e.g. 5A or PH2) in the APT / UNIT field on the homepage.
Open Issues — 36
Critical
§ 27-2056.7, 27-2056.17 and 27-2056.8 ADM code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at bsmt-apt bsmtw, 1st bsmt-apt from west at north
HPD · Filed mar 2026 · Open
Critical
§ 27-2056.7, 27-2056.17 and 27-2056.8 ADM code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment
Apt V · 5th floor · 1st apartment from north at east
HPD · Filed mar 2026 · Open ·
Critical
§ 27-2056.7, 27-2056.17 and 27-2056.8 ADM code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment
Apt C · 1st floor · 1st apartment from west at north
HPD · Filed mar 2026 · Open ·
Critical
§ 27-2056.4 ADM code- correct failure to notify occupants and/or to investigate lead-based paint hazards.
HPD · Filed dic 2025 · Open
Minor
§ 27-2056.4(h) and 27-2056.17 ADM code -correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities.
HPD · Filed dic 2025 · Open
+ 31 more open records
Resolved History — 14 (showing 3)
Closed
Properly repair or replace the broken or defective cracked glass at 1st pane from east above door at transom at building front entrance at public hall
§ 27-2005 HMC
HPD · Filed nov 2025 · Closed ·
Closed
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( c) mdl and 28 rcny §25-171: replace or repair the self-closing doors that is missing or defective [latch] door from street to basement at public hall
HPD · Filed nov 2025 · Closed
Closed
(a) § HMC: file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPD s website, www. NYC. Gov\hpd, search bed bugs.