未结违规
161
DOB + HPD
未付罚款
$12k
OATH / ECB
洪水区域
X
FEMA 划定
安全评分
63
综合指数
请注意:下载的 PDF 目前为英文版本;网页报告仍会使用您选择的语言显示。
律师助理收费 $400+ 的同等尽调服务,现在只需 $14.99 即时获取。报告生成失败或 NYC 上游数据被撤回可申请退款(退款政策)。
3 条
严重当前存在 161 条未结违规记录· DOB · HPD
提示年度房产税估算约为 US$272,364(2 类税级)· NYC DOF
提示最新抵押贷款:2021 年由 NEW YORK COMMUNITY BANK 提供,金额 US$499,999(另有 3 条,详见财务选项卡)· ACRIS
✓ 已验证 · PLUTO
建筑面积
54,084 sf
分区
R5
地下室
0
土地用途
Multi-Family Elevator Buildings
登记业主
快速信息
- 这栋楼有多少户?
- 47 户住宅.
- 这栋楼有多高?
- 6 层, non-fireproof结构, 建于 1940 年.
- 地块有多大?
- 27,000 平方英尺 (119 × 219 ft).
- 建筑等级是什么?
- D4 级 — Elevator apt。
- 这块地上有几栋楼?
- 地块上 1 栋建筑.
总体前景
Long-term signal for residential or commercial viability
Elevated Risk
维护可靠性
Multiple open violations — proceed with caution
20 / 100
安全
Moderate activity — typical urban
63 / 100
日常生活
Transit access via 169 St (F)
~4分钟 subway
Violations & Maintenance History
HPD · DOB · OATH — 46 open, 10 resolved
Tip: this building has 47 residential units and 46 open violations across all of them. To see only the records affecting your apartment, run a new search with your unit number (e.g. 5A or PH2) in the APT / UNIT field on the homepage.
Open Issues — 46
Minor
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling
§ 27-2005 ADM CODEApt 205 · 2nd floor · 1st room from north · 2nd apartment from east at south
HPD · Filed 2025年3月 · Open ·
Minor
§ 27-2017.3 HMC: trace and repair the source and abate the visible mold condition... Less than 10SQ feet at walls and ceiling in the 2nd room from north located at APT 205, 2nd story, 2nd apartment from east at south original violation 17747530 issued 09-mar-25 has been upgraded to class b per administrative code §27-2017.3A(3)(a) or (b).
HPD · Filed 2025年3月 · Open
Minor
§ 27-2026, 2027 HMC: properly repair the source and abate the evidence of a water leak over ceiling
Apt 205 · 2nd floor · 1st room from north · 2nd apartment from east at south
HPD · Filed 2025年3月 · Open ·
Minor
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling
§ 27-2005 ADM CODEApt 205 · 2nd floor · 2nd apartment from east at south
HPD · Filed 2025年3月 · Open ·
Minor
§ 27-2026, 2027 HMC: properly repair the source and abate the evidence of a water leak over ceiling
Apt 205 · 2nd floor · 2nd apartment from east at south
HPD · Filed 2025年3月 · Open ·
+ 41 more open records
Resolved History — 10 (showing 3)
Closed
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( c) mdl and 28 rcny §25-171: replace or repair the self-closing doors that is missing or defective hinges at bulkhead door leading to roof at public hall
HPD · Filed 2025年11月 · Closed
Closed
§ 27-2017.3 HMC: trace and repair the source and abate the visible mold condition... Less than 10SQ feet at walls and ceiling
Apt 205 · 2nd floor · 2nd room from north · 2nd apartment from east at south
HPD · Filed 2025年3月 · Closed ·
Closed
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling
§ 27-2005 ADM CODEApt 604 · 6th floor · 3rd room from east at south · 1st apartment from south at west
HPD · Filed 2024年3月 · Closed ·
+ 7 older resolved records