Long-term signal for residential or commercial viability
Elevated Risk
维护可靠性
Multiple open violations — proceed with caution
21 / 100
安全
Moderate activity — typical urban
76 / 100
日常生活
Transit access via Buhre Av (6)
~3分钟 subway
Compliance · 10-year history
Violation timeline
DOB · HPD · OATH
201620182020202220242026
Active20Resolved with debt0Resolved19Hover any dot for detail
Violations & maintenance history
HPD · DOB · OATH — 29 open, 22 resolved
Tip: this building has 22 residential units and 29 open violations across all of them. To see only the records affecting your apartment, run a new search with your unit number (e.g. 5A or PH2) in the APT / UNIT field on the homepage.
Open Issues — 29
Minor
Provide ready access to buildings heating system door locked at boiler room
§ 27-2033 ADM CODE
HPD · Filed 2024年12月 · Open ·
Minor
Provide hot water at all hot water fixtures
§ 27-2031 ADM CODEApt D5 · 4th floor · 1st apartment from south at west
HPD · Filed 2024年12月 · Open ·
Minor
HMC ADM code: § 27-2017.4 abate the infestation consisting of roaches
Apt A2 · 1st floor · 1st apartment from east at south
HPD · Filed 2023年12月 · Open ·
Minor
HMC ADM code: § 27-2017.4 abate the infestation consisting of mice
Apt A2 · 1st floor · 1st apartment from east at south
HPD · Filed 2023年12月 · Open ·
Critical
§ 27-2056.7, 27-2056.17 and 27-2056.8 ADM code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment
Apt A1 · 1st floor · 1st apartment from south at west
HPD · Filed 2023年9月 · Open ·
Resolved History — 22 (showing 3)
Closed
Owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
§27-2107 ADM CODE
HPD · Filed 2024年11月 · Closed ·
Closed
§ 27-2056.7, 27-2056.17 and 27-2056.8 ADM code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment
Apt E2 · 5th floor · 1st apartment from north at east
HPD · Filed 2023年9月 · Closed ·
Closed
§ 27-2056.4(a-1) - certify compliance with the requirement to perform one investigation for the presence of lead-based paint through xrf testing in a dwelling unit within one year after a child under age six has come to reside after august 9, 2020 by submitting the required supporting documentation for apartment located at