最新抵押贷款:2019 年由 APPLE BANK FOR SAVINGS 提供,金额 US$4,411,971(另有 4 条,详见财务选项卡)· ACRIS
建筑详情
✓ 已验证 · PLUTO
建筑面积
209,542 sf
分区
R7-1
地下室
0
土地用途
多户电梯公寓
登记业主
2041 Holland Associates LLC
租金管制
Yes · 171 regulated units(DHCR)
快速信息
这栋楼有多少户?
172 户住宅.
这栋楼有多高?
6 层, non-fireproof结构, 建于 1928 年.
地块有多大?
52,500 平方英尺 (200 × 262.42 ft).
建筑类别是什么?
D1 类 — Elevator apt。
这块地上有几栋楼?
地块上 1 栋建筑.
总体前景
Long-term signal for residential or commercial viability
Elevated Risk
维护可靠性
Multiple open violations — proceed with caution
37 / 100
安全
Moderate activity — typical urban
68 / 100
日常生活
Transit access via Bronx Park East (2 5)
~5分钟 subway
Compliance · 10-year history
Violation timeline
DOB · HPD · OATH
201620182020202220242026
Active16Resolved with debt0Resolved43Hover any dot for detail
Violations & maintenance history
HPD · DOB · OATH — 16 open, 43 resolved
Open Issues — 16
Minor
Provide unlockable slide bolt and lock or hook on roof door that allows re entry from roof to public hall east 1 bulkhead
§ 27-2005 ADM CODE
HPD · Filed 2026年6月 · Open ·
Minor
§ 27-2005, 2007 ADM code remove the illegal fastening consisting of panic bar installed on roof door that does not allow re-entry from roof to public hall east 1 bulkhead
HPD · Filed 2026年6月 · Open
Minor
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( c) mdl and 28 rcny §25-171: replace or repair the self-closing doors that is missing or defective from vestibule to public hall at public hall, 1st story
HPD · Filed 2026年6月 · Open
Minor
Properly repair or replace the broken or defective latch and asamblies at building entrance door from vestibule at public hall, 1st story
§ 27-2005 HMC
HPD · Filed 2026年6月 · Open ·
Minor
§ 27-2005, 2007 ADM code remove the illegal fastening consisting of panic bar installed on roof door that does not allow re-entry from roof to public hall west 1 bulkhead
HPD · Filed 2026年6月 · Open
Resolved History — 43 (showing 3)
Closed
Provide hot water at all hot water fixtures
§ 27-2031 ADM CODEApt A8 · 1st apartment from west at north
HPD · Filed 2026年3月 · Closed ·
Closed
§ 27-2026, 2027 HMC: properly repair the source and abate the evidence of a water leak over the ceiling ceiling
Apt A8 · 1st floor · 1st apartment from west at north
HPD · Filed 2025年12月 · Closed ·
Closed
§ 27-2026, 2027 HMC: properly repair the source and abate the evidence of a water leak over the ceiling north wall
Apt A8 · 1st floor · 4th room from east at south · 1st apartment from west at north