提示最新抵押贷款:2018 年由 PEOPLE'S UNITED BANK, NATIONAL ASSOCIATION 提供,金额 US$4,899,930(另有 6 条,详见财务选项卡)· ACRIS
建筑详情
✓ 已验证 · PLUTO
建筑面积
21,348 sf
商业面积
2,100 sf
分区
R7-2 · C2-4 overlay
地下室
Partial Basement
土地用途
Mixed Residential & Commercial
登记业主
Ritz Partners LLC
快速信息
这栋楼有多少户?
23 户住宅 及 2 个商业空间.
这栋楼有多高?
6 层, non-fireproof结构, 建于 1906 年.
地块有多大?
5,000 平方英尺 (50 × 100 ft).
建筑等级是什么?
C7 级 — Walk-up apt。
这块地上有几栋楼?
地块上 1 栋建筑.
总体前景
Long-term signal for residential or commercial viability
Elevated Risk
维护可靠性
Multiple open violations — proceed with caution
20 / 100
安全
Moderate activity — typical urban
76 / 100
日常生活
Transit access via 168 St (A C)
~4分钟 subway
Violations & Maintenance History
HPD · DOB · OATH — 57 open, 17 resolved
Tip: this building has 23 residential units and 57 open violations across all of them. To see only the records affecting your apartment, run a new search with your unit number (e.g. 5A or PH2) in the APT / UNIT field on the homepage.
Open Issues — 57
Minor
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( c) mdl and 28 rcny §25-171: replace or repair the self-closing doors that is missing or defective latch set at door
Apt 3 · 1st floor · 2nd apartment from north at east
HPD · Filed 2026年5月 · Open ·
Minor
Properly repair or replace the broken or defective wall cabinet at north wall
§ 27-2005 HMCApt 3 · 1st floor · 2nd apartment from north at east
HPD · Filed 2026年5月 · Open ·
Minor
Abate the nuisance consisting of scalding hot water exceeding 130 degrees at wash basin and bath tub (148 degrees)
§ 27-2005 ADM CODE & 309 M/D LAWApt 3 · 1st floor · 2nd apartment from north at east
HPD · Filed 2026年5月 · Open ·
Minor
HMC ADM code: § 27-2017.4 abate the infestation consisting of mice
Apt 3 · 1st floor · 2nd apartment from north at east
HPD · Filed 2026年5月 · Open ·
Minor
Provide adequate supply of cold water for the fixtures at bath tub
§ 27-2024 ADM CODEApt 3 · 1st floor · 2nd apartment from north at east
HPD · Filed 2026年5月 · Open ·
+ 52 more open records
Resolved History — 17 (showing 3)
Closed
At time of inspection I observed a awning with business accessory illuminated sign, side 20'X 3' read d'mcuritzci cake shop, was installed without a permit., obtain all permits
OATH · Filed 2022年12月 · Closed
Closed
Failure to maintain building in code compliant manner. Observed mini split air conditioning unit located at 1st floor commercial business "cake shop", noted approx 30LF of 3/4" pvc extending from mechanical equ
OATH · Filed 2022年10月 · Closed
Closed
Failure to maintain building in code-compliant manner: use of prohibited door and/or hardware per BC 1008.1.8; 27-371(j). At time of inspection of APT 5 on 2nd fl observed 4 rooms with key locking devices., pro