未结违规
35
DOB + HPD
未付罚款
$0
OATH / ECB
洪水区域
X
FEMA 划定
安全评分
75
综合指数
请注意:下载的 PDF 目前为英文版本;网页报告仍会使用您选择的语言显示。
律师助理收费 $400+ 的同等尽调服务,现在只需 $14.99 即时获取。报告生成失败或 NYC 上游数据被撤回可申请退款(退款政策)。
1 条
严重当前存在 35 条未结违规记录· DOB · HPD
✓ 已验证 · PLUTO
建筑面积
14,652 sf
分区
R7-1
地下室
Partial Basement
土地用途
Multi-Family Walk-Up Buildings
登记业主
快速信息
- 这栋楼有多少户?
- 16 户住宅.
- 这栋楼有多高?
- 5 层, non-fireproof结构, 建于 1910 年.
- 地块有多大?
- 3,325 平方英尺 (33.25 × 100 ft).
- 建筑等级是什么?
- C1 级 — Walk-up apt。
- 这块地上有几栋楼?
- 地块上 1 栋建筑.
总体前景
Long-term signal for residential or commercial viability
Elevated Risk
维护可靠性
Multiple open violations — proceed with caution
20 / 100
安全
Moderate activity — typical urban
75 / 100
日常生活
Transit access via 182-183 Sts (B D)
~13分钟 subway
Violations & Maintenance History
HPD · DOB · OATH — 35 open, 15 resolved
Tip: this building has 16 residential units and 35 open violations across all of them. To see only the records affecting your apartment, run a new search with your unit number (e.g. 5A or PH2) in the APT / UNIT field on the homepage.
Open Issues — 35
Minor
§ 27-2005, 2007 ADM code remove device preventing door from being self-closing hook to hold permanent device installed at vestibule door , 1st story
HPD · Filed 2026年4月 · Open
Minor
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
§ 27-2021 ADM CODE
HPD · Filed 2026年4月 · Open ·
Minor
Abate the nuisance consisting of plexiglass installed at vestibule door , 1st story
§ 27-2005 ADM CODE & 309 M/D LAW
HPD · Filed 2026年4月 · Open ·
Minor
§27-2104(b) HMC post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the building s entrance. For more information about signage requirements, please visit: https://www. NYC. Gov/site/hpd/services-and-information/required-signage. Page
HPD · Filed 2026年4月 · Open
Minor
Provide approved glass at vestibule door , 1st story
§ 27-2005 ADM CODE
HPD · Filed 2026年4月 · Open ·
+ 30 more open records
Resolved History — 15 (showing 3)
Closed
§ 27-2056.7, 27-2056.8, 27-2056.9 ADM code -certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, presumed lead paint in an apartment with a child under six
Apt 14
HPD · Filed 2025年12月 · Closed ·
Closed
§ 27-2056.6 ADM code - correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) north wall, 1st window frame from west at north wall
Apt 14 · 2nd room from east at north
HPD · Filed 2025年12月 · Closed ·
Closed
§ 27-2056.6 ADM code - correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, north wall, 1st window frame from east at south wall
Apt 14
HPD · Filed 2025年12月 · Closed ·
+ 12 older resolved records