未结违规
397
DOB + HPD
未付罚款
$72k
OATH / ECB
洪水区域
X
FEMA 划定
安全评分
70
综合指数
请注意:下载的 PDF 目前为英文版本;网页报告仍会使用您选择的语言显示。
律师助理收费 $400+ 的同等尽调服务,现在只需 $14.99 即时获取。报告生成失败或 NYC 上游数据被撤回可申请退款(退款政策)。
2 条
严重当前存在 397 条未结违规记录· DOB · HPD
提示年度房产税估算约为 US$72,314(2 类税级)· NYC DOF
✓ 已验证 · PLUTO
建筑面积
10,612 sf
商业面积
2,653 sf
分区
R7B
地下室
Full Basement
土地用途
Mixed Residential & Commercial
登记业主
快速信息
- 这栋楼有多少户?
- 8 户住宅 及 2 个商业空间.
- 这栋楼有多高?
- 4 层, non-fireproof结构, 建于 1910 年.
- 地块有多大?
- 3,229 平方英尺 (32 × 100.92 ft).
- 建筑等级是什么?
- C7 级 — Walk-up apt。
- 这块地上有几栋楼?
- 地块上 1 栋建筑.
总体前景
Long-term signal for residential or commercial viability
Elevated Risk
维护可靠性
Multiple open violations — proceed with caution
20 / 100
安全
Moderate activity — typical urban
70 / 100
日常生活
Transit access via 116 St (6)
~5分钟 subway
Violations & Maintenance History
HPD · DOB · OATH — 59 open, 0 resolved
Tip: this building has 8 residential units and 59 open violations across all of them. To see only the records affecting your apartment, run a new search with your unit number (e.g. 5A or PH2) in the APT / UNIT field on the homepage.
Open Issues — 59
Critical
§ 27-2056.6 ADM code - correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) east wall
Apt 3B · 3rd floor · 2nd apartment from east at south
HPD · Filed 2026年5月 · Open ·
Critical
§ 27-2056.6 ADM code - correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st radiator from east at south wall, north wall, south wall
Apt 3B · 3rd floor · 2nd room from north · 2nd apartment from east at south
HPD · Filed 2026年5月 · Open ·
Critical
§ 27-2056.6 ADM code - correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) west wall
Apt 3B · 3rd floor · 2nd apartment from east at south
HPD · Filed 2026年5月 · Open ·
Critical
§ 27-2056.6 ADM code - correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) east wall
Apt 3B · 3rd floor · 2nd apartment from east at south
HPD · Filed 2026年5月 · Open ·
Critical
§ 27-2056.6 ADM code - correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st riser from north at east wall, south wall
Apt 3B · 3rd floor · 1st room from north · 2nd apartment from east at south
HPD · Filed 2026年5月 · Open ·
+ 54 more open records