MinorBC 3308.5 inadequate vertical netting/cable system on several floors @ expo1 & 3. Loose vertical debris netting not adequately secured, not preventing debris from falling off site. Zero cable not adequately ten
OATH · Filed 2026年1月 · Open
MinorAt time of inspection observed active job site. Upon request for approved scaffold plan, sst card for competent person unable to provide. Provide all document on site as require. Comply with code. Provide requi
OATH · Filed 2025年12月 · Open
CriticalAt time of inspection observed active job site. I observed unsafe storage area provide on street does not maintain. Created an unsafe condition for pedestrian passing the job site under sidewalk shed. Comply wi
OATH · Filed 2025年12月 · Open
CriticalFailure to provide adequate safety measure for all persons. Needle beam installed on stairs lobby very closed to steps created a tripped hazard conditions. Stop use of egress at 3rd to 4 floor level. Provide sa
OATH · Filed 2025年12月 · Open
CriticalAt time of inspection observed active job site. 3rd floor level slab needle beam installed at expose 3 work does not confirm as per plan. Missing shoring posts and locations. Created unsafe conditions for use n
OATH · Filed 2025年12月 · Open
ClosedNote: at time of inspection of active construction site, I observed ongoing concrete operations with the concrete pump truck outriggers extended onto the sidewalk obstruction the clear passageway of 5 feet for
OATH · Filed 2025年10月 · Closed
ClosedNote: at time of inspection of active construction site, I observed inadequate roof protection at expo# 2, which does not comply with the approved site safety plans. Additionally, scattered construction debris
OATH · Filed 2025年10月 · Closed
ClosedNote: at time of inspection of active construction site, I observed a supported pipe scaffold erected on top of the sidewalk shed. Upon reviewing the approved sidewalk shed plans, it was noted that the scaffold
OATH · Filed 2025年10月 · Closed