Long-term signal for residential or commercial viability
Elevated Risk
维护可靠性
Multiple open violations — proceed with caution
20 / 100
安全
Elevated activity — consider before signing
59 / 100
日常生活
Transit access via E 149 St (6)
~1分钟 subway
Violations & Maintenance History
HPD · DOB · OATH — 50 open, 3 resolved
Tip: this building has 65 residential units and 50 open violations across all of them. To see only the records affecting your apartment, run a new search with your unit number (e.g. 5A or PH2) in the APT / UNIT field on the homepage.
Open Issues — 50
Minor
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall
§ 27-2005 ADM CODEApt 25A · 4th floor · 1st apartment from west at north
HPD · Filed 2026年4月 · Open ·
Minor
Paint with light colored paint wood door frame and trim
§ 27-2013 ADM CODEApt 2B · 1st floor · 1st apartment from north at east
HPD · Filed 2026年4月 · Open ·
Minor
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling
§ 27-2005 ADM CODEApt 2B · 1st floor · 3rd room from east · 1st apartment from north at east
HPD · Filed 2026年4月 · Open ·
Minor
Repair the leaky and/or defective faucets at bathtub
§ 27-2026 ADM CODEApt 55D · 2nd floor · 1st apartment from south at west
HPD · Filed 2026年4月 · Open ·
Minor
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling
§ 27-2005 ADM CODEApt 2B · 1st floor · 1st apartment from north at east
HPD · Filed 2026年4月 · Open ·
+ 45 more open records
Resolved History — 3
Closed
At the time of inspection I observed in apartment 49D half of the apartment has no power tripped circuit breakers non working outlets switches and fixtures, comply with ec
OATH · Filed 2023年1月 · Closed
Closed
Open electrical box in ceiling-mixing valve/coil piping not properly supported from ceiling-flue pipe sagging, has too big a hole for smoke watchman-guard missing from gage glass assembly.
OATH · Filed 2021年10月 · Closed
Closed
Failure to maintain building in code compliant manner. Noted: observed at "B" side of building at roof bulkhead spallling and missing plaster around skylight exposing steel supports due to water penetration. Remed