最新抵押贷款:2018 年由 SIGNATURE BANK 提供,金额 US$8,000,000(另有 9 条,详见财务选项卡)· ACRIS
建筑详情
✓ 已验证 · PLUTO
建筑面积
21,072 sf
商业面积
3,512 sf
分区
R8A · C2-5 overlay
地下室
半地下室
土地用途
住宅与商业混合
登记业主
964 Mv I LLC
租金管制
Yes · 10 regulated units(DHCR)
快速信息
这栋楼有多少户?
22 户住宅 及 4 个商业空间.
这栋楼有多高?
6 层, non-fireproof结构, 建于 1900 年.
地块有多大?
5,033 平方英尺 (50.33 × 100 ft).
建筑类别是什么?
C7 类 — Walk-up apt。
这块地上有几栋楼?
地块上 1 栋建筑.
总体前景
Long-term signal for residential or commercial viability
Elevated Risk
维护可靠性
Multiple open violations — proceed with caution
20 / 100
安全
Moderate activity — typical urban
74 / 100
日常生活
Transit access via Cathedral Pkwy (110 St) (1)
~4分钟 subway
Compliance · 10-year history
Violation timeline
DOB · HPD · OATH
201620182020202220242026
Active28Resolved with debt3Resolved26Hover any dot for detail
Violations & maintenance history
HPD · DOB · OATH — 28 open, 29 resolved
Tip: this building has 22 residential units and 28 open violations across all of them. To see only the records affecting your apartment, run a new search with your unit number (e.g. 5A or PH2) in the APT / UNIT field on the homepage.
Open Issues — 28
Minor
§ 27-2045(b)(1)(a) HMC, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective
Apt 5D · 5th floor · 1st apartment from north at east
HPD · Filed 2026年5月 · Open ·
Minor
HMC ADM code: § 27-2017.4 abate the infestation consisting of roaches
Apt 5D · 5th floor · 1st apartment from north at east
HPD · Filed 2026年5月 · Open ·
Minor
§ 27-2045(b)(1)(b) HMC, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective
Apt 5D · 5th floor · 1st apartment from north at east
HPD · Filed 2026年5月 · Open ·
Minor
§27-2104(b) HMC post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the building s entrance. For more information about signage requirements, please visit: https://www. NYC. Gov/site/hpd/services-and-information/required-signage. Page
HPD · Filed 2026年5月 · Open
Minor
Repair the leaky and/or defective faucets at wash basin
§ 27-2026 ADM CODEApt 4B · 4th floor · 2nd apartment from south at west
HPD · Filed 2026年5月 · Open ·
Resolved History — 29 (showing 3)
Closed
Provide ready access to buildings heating system locked door at cellar at boiler room
§ 27-2033 ADM CODE
HPD · Filed 2026年1月 · Closed ·
Closed
Provide an adequate supply of heat for the apartment
§ 27-2029 ADM CODEApt 2C · 2nd floor · 2nd apartment from north at east
HPD · Filed 2026年1月 · Closed ·
Closed
HMC ADM code: § 27-2017.4 abate the infestation consisting of roaches
Apt 4B · 4th floor · 2nd apartment from south at west