Skip to main content
New search
Property Audit ReportBBL 1008037502Generated Jun 12, 2026
Safe to Sign

Open Violations

0

DOB + HPD

Unpaid Fines

$0

OATH / ECB

Flood Zone

X

FEMA designation

Audit Score

71/100

Composite index

Address-level public record preview

301 7 Avenue is tracked in NYC Property Audit as BBL 1008037502, located in MN, built in 1920, 0 open DOB/HPD violation signals, FEMA flood zone X. The free preview keeps address-level facts crawl-visible while the full due-diligence report remains available in the audit.

Unlock the full 13-page report — $9.99
Free previewPro unlocks: owner of record · mortgage details · fine amounts · permit costs · school ratings · neighborhood demographics Unlock full report

Free preview · 2 pages

Unlock the full PDF

All findings, all sources, one defensible document.

Download Full Property Report

One-time payment · $9.99 · Secure Stripe checkout

Key Findings

1 item
Annual property tax estimated at ~$1,640,369 (Tax Class 4)· NYC DOF

Building Details

✓ Verified · PLUTO
Building Area
119,248 sf
Commercial Area
119,248 sf
Zoning
M1-8A/R11
Basement
Converted
Land Use
Commercial & Office
Registered Owner
Quick facts
How many units does this building have?
0 residential units and 35 commercial spaces.
How tall is this building?
21 stories, built in 1920.
How big is the lot?
8,068 sq ft (77.75 ft × 106.2 ft).
What's the building class?
Class RC — Condo.
How many buildings are on this lot?
1 building on the lot.
Overall Outlook
Long-term signal for residential or commercial viability
Standard Urban
Maintenance Reliability
Clean record — safe to sign
100 / 100
Safety
Moderate activity — typical urban
71 / 100
Daily Life
Transit access via 28 St (1)
~1 min subway

Compliance · 10-year history

Violation timeline

DOB · HPD · OATH
201620182020202220242026
Active0Resolved with debt0Resolved3Hover any dot for detail

Violations & maintenance history

HPD · DOB · OATH0 open, 3 resolved

Resolved History — 3
Closed
Observed outrigger beams suspended scaffold installed on 17th floor setback with lifelines/tiebacks anchorage system installed to walls -upon asking for pull test performed on 17th floor setbacks anchorage syst
OATH · Filed Oct 2024 · Closed
Closed
Outrigger beams suspended scaffold installed contrary to plans; tiebacks from beam to wall not in 45 deegre angle , using 3 bays under beam-plans show 2, anchorage system installed at wall for lifelines/tiebacks-
OATH · Filed Oct 2024 · Closed
Closed
27-929.1 acsec27-929.1, failure to complete installation of full systemof automatic sprinklers&file sprinkler report prepared by registered design professional in office bldg 100' or more in ht in existence on10
OATH · Filed Mar 2021 · Closed

Other properties in the area with active violation history — useful comparables when evaluating risk.

Browse all Manhattan buildings in our index →