Skip to main content
New search
Property Audit ReportBBL 1014167501Generated Jun 11, 2026
Caution — Review Before Signing

Open Violations

28

DOB + HPD

Unpaid Fines

$14k

OATH / ECB

Flood Zone

X

FEMA designation

Audit Score

74/100

Composite index

Address-level public record preview

200 East 62 Street is tracked in NYC Property Audit as BBL 1014167501, located in MN, built in 1967, 113 residential units, 28 open DOB/HPD violation signals, $13,750 in unpaid OATH fines, FEMA flood zone X. The free preview keeps address-level facts crawl-visible while the full due-diligence report remains available in the audit.

Unlock the full 13-page report — $9.99
Free previewPro unlocks: owner of record · mortgage details · fine amounts · permit costs · school ratings · neighborhood demographics Unlock full report

Free preview · 2 pages

Unlock the full PDF

All findings, all sources, one defensible document.

Download Full Property Report

One-time payment · $9.99 · Secure Stripe checkout

Key Findings

2 items
28 open violations on record· DOB · HPD
Annual property tax estimated at ~$4,962,106 (Tax Class 2) — assessed per building, not per unit· NYC DOF

Building Details

✓ Verified · PLUTO
Building Area
247,605 sf
Commercial Area
51,715 sf
Zoning
C1-9 / R8B
Basement
Converted
Garage
Y
Land Use
Mixed Residential & Commercial
Rent Regulation
Yes · 12 regulated units(DHCR)
Quick facts
How many units does this building have?
113 residential units and 3 commercial spaces.
How tall is this building?
30 stories, built in 1967.
How big is the lot?
20,128 sq ft (176.42 ft × 123.75 ft).
What's the building class?
Class RM — Condo.
How many buildings are on this lot?
1 building on the lot.
Overall Outlook
Long-term signal for residential or commercial viability
Elevated Risk
Maintenance Reliability
Multiple open violations — proceed with caution
20 / 100
Safety
Moderate activity — typical urban
74 / 100
Daily Life
Transit access via Lexington Av/59 St (N R W)
~2 min subway

Compliance · 10-year history

Violation timeline

DOB · HPD · OATH
201620182020202220242026
Active25Resolved with debt4Resolved20Hover any dot for detail

Violations & maintenance history

HPD · DOB · OATH28 open, 32 resolved

Tip: this building has 113 residential units and 28 open violations across all of them. To see only the records affecting your apartment, run a new search with your unit number (e.g. 5A or PH2) in the APT / UNIT field on the homepage.
Open Issues — 28
Minor
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling.
§ 27-2005 ADM CODEApt 17A · 17th floor · 2nd apartment from south at west
HPD · Filed Oct 2025 · Open ·
Minor
§ 27-2026, 2027 HMC: properly repair the source and abate the evidence of a water leak on the ceiling
Apt 4B · 4th floor · 1st room from east · 1st apartment from north at east
HPD · Filed Jul 2023 · Open ·
Minor
Properly repair with similar material the broken or defective wood floor
§ 27-2005 ADM CODEApt 4B · 4th floor · 1st room from east · 1st apartment from north at east
HPD · Filed Jul 2023 · Open ·
Minor
Paint with light colored paint the ceiling
§ 27-2013 ADM CODEApt 4B · 4th floor · 1st room from east · 1st apartment from north at east
HPD · Filed Jul 2023 · Open ·
Minor
Properly repair with similar material the broken or defective ceramic floor tiles
§ 27-2005 ADM CODEApt 4B · 4th floor · 1st apartment from north at east
HPD · Filed Jul 2023 · Open ·
Resolved History — 32 (showing 3)
Closed
BC 3303.7.2_during my inspection of an active job site for a 30-story alt, I observed inadequate fire extinguishers. Specifically, there were missing safety inspection tags and missing monthly inspections. Compl
OATH · Filed Dec 2025 · Closed
Closed
During my inspection of an active 30-story alt, I requested the qsp to provide the current pre shift meeting log, toolbox talk log, motor inspection log for suspended scaffold . However, these document were no
OATH · Filed Dec 2025 · Closed
Closed
BC 3309.10_during my inspection of the active job site for the 30-story alteration (alt) project, I observed that roof protection for the adjacent building at exposure #2 was not installed. This lack of adequate
OATH · Filed Dec 2025 · Closed

Other properties in the area with active violation history — useful comparables when evaluating risk.

Browse all Manhattan buildings in our index →