Skip to main content
New search
Property Audit ReportBBL 1015760014Generated Jun 12, 2026

Elevator apt

515 East 79 Street

Caution — Review Before Signing

Open Violations

5

DOB + HPD

Unpaid Fines

$16k

OATH / ECB

Flood Zone

X

FEMA designation

Audit Score

83/100

Composite index

Address-level public record preview

515 East 79 Street is tracked in NYC Property Audit as BBL 1015760014, located in MN, built in 1981, 163 residential units, 5 open DOB/HPD violation signals, $16,310 in unpaid OATH fines, FEMA flood zone X. The free preview keeps address-level facts crawl-visible while the full due-diligence report remains available in the audit.

Unlock the full 13-page report — $9.99
Free previewPro unlocks: owner of record · mortgage details · fine amounts · permit costs · school ratings · neighborhood demographics Unlock full report

Free preview · 2 pages

Unlock the full PDF

All findings, all sources, one defensible document.

Download Full Property Report

One-time payment · $9.99 · Secure Stripe checkout

Key Findings

3 items
5 open violations on record· DOB · HPD
Annual property tax estimated at ~$2,592,704 (Tax Class 2)· NYC DOF
Most recent mortgage: $3,330,865 from APPLE BANK FOR SAVINGS in 2019· ACRIS

Building Details

✓ Verified · PLUTO
Building Area
232,400 sf
Zoning
R10A
Basement
Partial Basement
Land Use
Multi-Family Elevator Buildings
Registered Owner
Quick facts
How many units does this building have?
163 residential units.
How tall is this building?
30 stories, non-fireproof construction, built in 1981.
How big is the lot?
18,900 sq ft (185 ft × 102.25 ft).
What's the building class?
Class D4 — Elevator apt.
How many buildings are on this lot?
1 building on the lot.
Overall Outlook
Long-term signal for residential or commercial viability
Elevated Risk
Maintenance Reliability
Multiple open violations — proceed with caution
43 / 100
Safety
Stable low-activity area
83 / 100
Daily Life
Transit access via 86 St (Q)
~10 min subway

Compliance · 10-year history

Violation timeline

DOB · HPD · OATH
201620182020202220242026
Active5Resolved with debt0Resolved6Hover any dot for detail

Violations & maintenance history

HPD · DOB · OATH5 open, 6 resolved

Open Issues — 5
Minor
Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings. At time of inspection, contractor has failed to file a certificate of correction for violation
OATH · Filed Feb 2026 · Open
Minor
Upon inspection I observed a sidewalk shed installed at expos 1 contrary to code. Multiple mudsills not secured to vertical members and footings sitting on styrofoam contrary to code 3307.6.4.10 founding. Pipes
OATH · Filed Dec 2025 · Open
Critical
Upon inspection of an active 30 story facade alt construction site I observed several unsafe conditions that should of been addressed by the ssm. Shed installed contrary to code and ssp/sh drawings (missing 20
OATH · Filed Dec 2025 · Open
Critical
Upon inspection I observed a sidewalk shed installed unsafely and contrary to approved drawings. Multiple locations with styrofoam installed under the footings contrary to the drawings and code. Missing 20FT ex
OATH · Filed Dec 2025 · Open
Minor
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing. At public hall, 1st story
§ 27-2033 ADM CODE
HPD · Filed May 2018 · Open ·
Resolved History — 6 (showing 3)
Closed
Upon inspection of an active 30 story facade alt I observed a sidewalk shed installed at exposure 1. Upon review of the approved DOB drawings I observed no 20FT extension provided at adjoining property as per c
OATH · Filed Dec 2025 · Closed
Closed
Upon inspection I observed pedestrian protection (street storage/work zone) in use unsafely installed in street. Street storage was not fully enclosed to protect pedestrians on sidewalk or street (3307.4.7). Je
OATH · Filed Dec 2025 · Closed
Closed
Observed material hoist installed at exp #1 contrary to plans-missing blocks/cribbing at front support as per plans , installed insulation under front support-not on plans-stop all use of material hoist
OATH · Filed Aug 2025 · Closed

Other properties in the area with active violation history — useful comparables when evaluating risk.

Browse all Manhattan buildings in our index →