Skip to main content
New search
Property Audit ReportBBL 3050450046Generated Jun 11, 2026
Caution — Review Before Signing

Open Violations

9

DOB + HPD

Unpaid Fines

$0

OATH / ECB

Flood Zone

X

FEMA designation

Audit Score

76/100

Composite index

Address-level public record preview

92 Hawthorne Street is tracked in NYC Property Audit as BBL 3050450046, located in BK, built in 1917, 16 residential units, 9 open DOB/HPD violation signals, FEMA flood zone X. The free preview keeps address-level facts crawl-visible while the full due-diligence report remains available in the audit.

Unlock the full 13-page report — $9.99
Free previewPro unlocks: owner of record · mortgage details · fine amounts · permit costs · school ratings · neighborhood demographics Unlock full report

Free preview · 2 pages

Unlock the full PDF

All findings, all sources, one defensible document.

Download Full Property Report

One-time payment · $9.99 · Secure Stripe checkout

Key Findings

4 items
9 open violations on record· DOB · HPD
Annual property tax estimated at ~$97,265 (Tax Class 2)· NYC DOF
Last sold for $1,375,000 in July 2007· ACRIS
Most recent mortgage: $495,519 from INTERVEST NATIONAL BANK in 2007· ACRIS

Building Details

✓ Verified · PLUTO
Building Area
14,856 sf
Zoning
R6
Basement
Partial Basement
Land Use
Multi-Family Walk-Up Buildings
Registered Owner
Rent Regulation
Yes · 6 regulated units(DHCR)
Quick facts
How many units does this building have?
16 residential units.
How tall is this building?
4 stories, non-fireproof construction, built in 1917.
How big is the lot?
5,282 sq ft (49.83 ft × 106 ft).
What's the building class?
Class C1 — Walk-up apt.
How many buildings are on this lot?
1 building on the lot.
Overall Outlook
Long-term signal for residential or commercial viability
Stable — Review Maintenance
Maintenance Reliability
Multiple open violations — proceed with caution
82 / 100
Safety
Moderate activity — typical urban
76 / 100
Daily Life
Transit access via Parkside Av (Q)
~5 min subway

Compliance · 10-year history

Violation timeline

DOB · HPD · OATH
201620182020202220242026
Active3Resolved with debt0Resolved37Hover any dot for detail

Violations & maintenance history

HPD · DOB · OATH4 open, 46 resolved

Open Issues — 4
Minor
Properly repair with similar material the broken or defective wood floor
§ 27-2005 ADM CODEApt 9 · 3rd floor · 1st room from north at west · 1st apartment from west at north
HPD · Filed Jul 2016 · Open ·
Minor
Paint with light colored paint all ceilings
§ 27-2013 ADM CODEApt 9 · 3rd floor · 1st apartment from west at north
HPD · Filed Jul 2016 · Open ·
Minor
Properly repair the broken or defective spring balances at lower sashes of 1st and 2nd windows at north
§ 27-2005 ADM CODEApt 9 · 3rd floor · 1st room from north at west · 1st apartment from west at north
HPD · Filed Jul 2016 · Open ·
Minor
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. At public hall, 1st story
§ 27-2053 ADM CODE
HPD · Filed May 2010 · Open ·
Resolved History — 46 (showing 3)
Closed
§ 27-2005, 2007 ADM code remove the illegal fastening consisiting of a slide bolt capable of being locked installed at iron gate in fence at front yard, preventing egress from fire escapes
HPD · Filed Jun 2020 · Closed
Closed
§ 27-2043.1 HMC install the missing or repair/replace the defective window guard(s) throughout the public areas in accordance with the specifications of the new york city health code section 24 rcny chapter 12. At public hall
HPD · Filed Nov 2019 · Closed
Closed
§ 27-2026, 2027 HMC: properly repair the source and abate the evidence of a water leak at ceiling
Apt 5 · 2nd floor · 1st apartment from west at north
HPD · Filed Oct 2017 · Closed ·

Other properties in the area with active violation history — useful comparables when evaluating risk.

Browse all Brooklyn buildings in our index →