Skip to main content
New search
Property Audit ReportBBL 1009040050Generated Jun 12, 2026

Elevator apt

309 3 Avenue

Caution — Review Before Signing

Open Violations

5

DOB + HPD

Unpaid Fines

$5k

OATH / ECB

Flood Zone

X

FEMA designation

Audit Score

74/100

Composite index

Address-level public record preview

309 3 Avenue is tracked in NYC Property Audit as BBL 1009040050, located in MN, built in 1972, 164 residential units, 5 open DOB/HPD violation signals, $5,000 in unpaid OATH fines, FEMA flood zone X. The free preview keeps address-level facts crawl-visible while the full due-diligence report remains available in the audit.

Unlock the full 13-page report — $9.99
Free previewPro unlocks: owner of record · mortgage details · fine amounts · permit costs · school ratings · neighborhood demographics Unlock full report

Free preview · 2 pages

Unlock the full PDF

All findings, all sources, one defensible document.

Download Full Property Report

One-time payment · $9.99 · Secure Stripe checkout

Key Findings

3 items
5 open violations on record· DOB · HPD
Annual property tax estimated at ~$2,255,809 (Tax Class 2)· NYC DOF
Most recent mortgage: $2,000,000 from NEW YORK COMMUNITY BANK in 2020 (+2 more on Financials)· ACRIS

Building Details

✓ Verified · PLUTO
Building Area
144,860 sf
Commercial Area
11,725 sf
Zoning
C2-8A
Basement
Partial Basement
Garage
Y
Land Use
Multi-Family Elevator Buildings
Registered Owner
Quick facts
How many units does this building have?
164 residential units and 1 commercial space.
How tall is this building?
18 stories, non-fireproof construction, built in 1972.
How big is the lot?
12,050 sq ft (123.42 ft × 97.58 ft).
What's the building class?
Class D4 — Elevator apt.
How many buildings are on this lot?
1 building on the lot.
Overall Outlook
Long-term signal for residential or commercial viability
Stable — Review Maintenance
Maintenance Reliability
Multiple open violations — proceed with caution
70 / 100
Safety
Moderate activity — typical urban
74 / 100
Daily Life
Transit access via 23 St-Baruch College (6)
~4 min subway

Compliance · 10-year history

Violation timeline

DOB · HPD · OATH
201620182020202220242026
Active1Resolved with debt0Resolved5Hover any dot for detail

Violations & maintenance history

HPD · DOB · OATH5 open, 5 resolved

Open Issues — 5
Minor
37-751. Violation of condition as of right privately owned public spaceat time of inspection noted approx 250FT of metal spikes have been affixed to masonry planter edges. As per NYC zoning resolution chapter 7 s
OATH · Filed Mar 2022 · Open
Minor
Section 27-2005 ADM code & 309 M/D law abate the nuisance consisting of evidence of water leak at ceiling
Apt 1402 · 14th floor · 1st room from east
HPD · Filed Mar 2010 · Open ·
Minor
Section 27-2005 ADM code repair the broken or defective plastered surfaces and paint in a uniform color ceiling
Apt 1402 · 14th floor · 1st room from east
HPD · Filed Mar 2010 · Open ·
Minor
Section 27-2005 ADM code properly repair with similar material the broken or defective vinyl floor tiles
Apt 1402 · 14th floor · 1st room from east
HPD · Filed Mar 2010 · Open ·
Minor
Section 27-2005 HMC: trace and repair the source and abate the nuisance consisting of mold ... Ceiling
Apt 1402 · 14th floor · 1st room from east
HPD · Filed Mar 2010 · Open ·
Resolved History — 5 (showing 3)
Closed
Owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
§27-2107 ADM CODE
HPD · Filed Nov 2024 · Closed ·
Closed
Active construction job site,4 outrigger suspended scaffold installed at site, uppon asking for service report for motors installed on scaffolds -none were provided, missing/unreadable motors manufacturers label
OATH · Filed Jun 2022 · Closed
Closed
Active construction job site , work being performed on suspended scaffold, uppon reviewing cd5 measurements from fulcrum point to counterweights should be 13 feet-installed 12.5 feet installed 11.7 feet on othe
OATH · Filed Jun 2022 · Closed

Other properties in the area with active violation history — useful comparables when evaluating risk.

Browse all Manhattan buildings in our index →