949 West End Avenue is tracked in NYC Property Audit as BBL 1018920016, located in MN, built in 1915, 60 residential units, 12 open DOB/HPD violation signals, $1,250 in unpaid OATH fines, FEMA flood zone X. The free preview keeps address-level facts crawl-visible while the full due-diligence report remains available in the audit.
Free preview — Pro unlocks: owner of record · mortgage details · fine amounts · permit costs · school ratings · neighborhood demographicsUnlock full report →
Audit
949 WEST END AVENU
✓
Free preview · 2 pages
Unlock the full PDF
All findings, all sources, one defensible document.
Annual property tax estimated at ~$649,335 (Tax Class 2)· NYC DOF
Most recent mortgage: $700,000 from SANTANDER BANK, N.A. in 2018 (+4 more on Financials)· ACRIS
Building Details
✓ Verified · PLUTO
Building Area
83,805 sf
Zoning
R10A
Basement
Partial Basement
Land Use
Multi-Family Elevator Buildings
Registered Owner
949 Associates LP
Rent Regulation
Yes · 25 regulated units(DHCR)
Quick facts
How many units does this building have?
60 residential units.
How tall is this building?
12 stories, non-fireproof construction, built in 1915.
How big is the lot?
7,500 sq ft (75 ft × 100 ft).
What's the building class?
Class D3 — Elevator apt.
How many buildings are on this lot?
1 building on the lot.
Overall Outlook
Long-term signal for residential or commercial viability
Caution — Known Issues
Maintenance Reliability
Multiple open violations — proceed with caution
60 / 100
Safety
Moderate activity — typical urban
77 / 100
Daily Life
Transit access via Cathedral Pkwy (110 St) (1)
~3 min subway
Compliance · 10-year history
Violation timeline
DOB · HPD · OATH
201620182020202220242026
Active12Resolved with debt1Resolved21Hover any dot for detail
Violations & maintenance history
HPD · DOB · OATH — 12 open, 26 resolved
Open Issues — 12
Minor
§ 329, M/D law and DEPT. Rules and regs. Provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story
HPD · Filed Apr 2026 · Open
Minor
§ 300 M/D law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration consisting of dry wall partition erected from floor to ceiling creating additional room and hence reducing natural light and ventilation
Apt 8B · 8th floor · 1st room from north · 2nd apartment from north at east
HPD · Filed Mar 2026 · Open ·
Critical
§ 27-2056.7, 27-2056.17 and 27-2056.8 ADM code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment
Apt 7E · 7th floor · 2nd apartment from north at east
HPD · Filed Nov 2025 · Open ·
Critical
§ 27-2056.7, 27-2056.17 and 27-2056.8 ADM code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment
Apt 10F · 10th floor · 1st apartment from south at west
HPD · Filed Nov 2025 · Open ·
Critical
§ 27-2056.7, 27-2056.17 and 27-2056.8 ADM code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment
Apt 12D · 12th floor · 1st apartment from north at east
HPD · Filed Nov 2025 · Open ·
Resolved History — 26 (showing 3)
Closed
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( c) mdl and 28 rcny §25-171: replace or repair the self-closing doors that is missing or defective hinges at secondary exit door
Apt 7A · 7th floor · 1st apartment from north at east
HPD · Filed Mar 2026 · Closed ·
Closed
§27-2104(b) HMC post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the building s entrance. For more information about signage requirements, please visit: https://www. NYC. Gov/site/hpd/services-and-information/required-signage. Page
HPD · Filed Feb 2026 · Closed
Closed
§ 27-2056.7, 27-2056.17 and 27-2056.8 ADM code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment
Apt 8B · 8th floor · 2nd apartment from north at east
HPD · Filed Nov 2025 · Closed ·
Nearby buildings to audit
Other properties in the area with active violation history — useful comparables when evaluating risk.