Long-term signal for residential or commercial viability
Elevated Risk
维护可靠性
Multiple open violations — proceed with caution
30 / 100
安全
Moderate activity — typical urban
77 / 100
日常生活
Transit access via 1 Av (L)
~6分钟 subway
Compliance · 10-year history
Violation timeline
DOB · HPD · OATH
201620182020202220242026
Active14Resolved with debt0Resolved25Hover any dot for detail
Violations & maintenance history
HPD · DOB · OATH — 26 open, 29 resolved
Tip: this building has 50 residential units and 26 open violations across all of them. To see only the records affecting your apartment, run a new search with your unit number (e.g. 5A or PH2) in the APT / UNIT field on the homepage.
Open Issues — 26
Minor
Properly repair with similar material the broken or defective fire retardant material at south wall and the ceiling at public hall, 1st story
§ 27-2005 ADM CODE
HPD · Filed 2019年4月 · Open ·
Minor
Paint with light colored paint at south wall and the ceiling at public hall, 1st story
§ 27-2013 ADM CODE
HPD · Filed 2019年4月 · Open ·
Minor
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 5th story
§ 27-2005 ADM CODE
HPD · Filed 2019年4月 · Open ·
Minor
§ 27-2026, 2027 HMC: properly repair the source and abate the evidence of a water leak at ceiling at public hall, 5th story
HPD · Filed 2019年4月 · Open
Minor
Paint with light colored paint at ceiling at public hall, 5th story
§ 27-2013 ADM CODE
HPD · Filed 2019年4月 · Open ·
Resolved History — 29 (showing 3)
Closed
Atoi observed no tpp or scbor posted throughout the building., post/distr. Notice
OATH · Filed 2025年9月 · Closed
Closed
Electrical panel completly exposed and unsafe wire splices throuout wire conection by entreane to unit 3, secure electrical device enclosure
OATH · Filed 2025年9月 · Closed
Closed
(a) § HMC: file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPD s website, www. NYC. Gov\hpd, search bed bugs.