Long-term signal for residential or commercial viability
Elevated Risk
维护可靠性
Multiple open violations — proceed with caution
20 / 100
安全
Moderate activity — typical urban
77 / 100
日常生活
Transit access via 14 St (1 2 3)
~1分钟 subway
Compliance · 10-year history
Violation timeline
DOB · HPD · OATH
201620182020202220242026
Violations & maintenance history
HPD · DOB · OATH — 33 open, 22 resolved
Tip: this building has 214 residential units and 33 open violations across all of them. To see only the records affecting your apartment, run a new search with your unit number (e.g. 5A or PH2) in the APT / UNIT field on the homepage.
Open Issues — 33
Minor
Properly repair the broken or defective left slider window sash at east prevented from sliding
§ 27-2005 ADM CODEApt 15M · 14th floor · 1st room from east · 3rd apartment from north at east
HPD · Filed 2021年8月 · Open ·
Minor
§ 329, M/D law and DEPT. Rules and regs. Provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
HPD · Filed 2020年10月 · Open
Minor
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling
§ 27-2005 ADM CODEApt 8J · 8th floor · 1st room from east at south · 1st apartment from north at east
HPD · Filed 2020年10月 · Open ·
Minor
HMC ADM code: § 27-2017.4 abate the infestation consisting of vermin water bugs in kitchen and bathroom
Apt 17C · 17th floor · 2nd apartment from south at west
HPD · Filed 2020年6月 · Open ·
Minor
HMC ADM code: § 27-2017.4 abate the infestation consisting of mice
Apt 17C · 17th floor · 2nd apartment from south at west
HPD · Filed 2020年6月 · Open ·
Resolved History — 22 (showing 3)
Closed
Work does not conform to approved construction documents and/or approved amendments. At time of inspection of a 19 story building under facade renovation, I observed the following conditions which were controlled
OATH · Filed 2021年8月 · Closed
Closed
Failure to safeguard all persons and property affected by constructionoperations. At time of inspection of a 19 story building under facade restoration, I observed a storage area on the 2nd exp4 setback with cons
OATH · Filed 2021年8月 · Closed
Closed
Compliance w/ construction documents, work not conform to approved/amended plans. Note: upon review of cd-5 for installation of suspended scaffold drawings show installation of parapet clamps unto parapet wall w/
OATH · Filed 2021年4月 · Closed
Active33Resolved with debt0Resolved22Hover any dot for detail