Long-term signal for residential or commercial viability
Caution — Known Issues
维护可靠性
Multiple open violations — proceed with caution
66 / 100
安全
Moderate activity — typical urban
69 / 100
日常生活
Transit access via 23 St (R W)
~3分钟 subway
Compliance · 10-year history
Violation timeline
DOB · HPD · OATH
201620182020202220242026
Active8Resolved with debt2Resolved1Hover any dot for detail
Violations & maintenance history
HPD · DOB · OATH — 8 open, 3 resolved
Open Issues — 8
Minor
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper.
§ 27-2053 ADM CODE
HPD · Filed 2024年1月 · Open ·
Minor
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing
§ 27-2045 ADM CODE
HPD · Filed 2024年1月 · Open ·
Minor
§ 27-2046.1 HMC: post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
HPD · Filed 2024年1月 · Open
Minor
§ 329, M/D law and DEPT. Rules and regs. Provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing
HPD · Filed 2024年1月 · Open
Minor
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
§ 27-2005 HMC
HPD · Filed 2024年1月 · Open ·
Resolved History — 3
Closed
Observed active jobsite with supported scaffold in use @ exposure 1. Upon review of DOB systems, it was apparent that the support scaffold permit expired 09/27/2025. Stop all use of supported scaffold. Obtain a
OATH · Filed 2025年10月 · Closed
Closed
Observed active street operations @ expo 1 of jobsite with a ladder to enter top deck of shed and a port-o-san on street surrounded by jersey barriers. As per manufacturer specs, the barriers are to be filled w
OATH · Filed 2025年10月 · Closed
Closed
Observed suspended scaffold being installed @ the roof level of jobsite. Upon review of DOB internal systems, gc failed to notify the department prior to installation of outrigger systems onsite. Stop all use/i