Long-term signal for residential or commercial viability
Elevated Risk
维护可靠性
Multiple open violations — proceed with caution
20 / 100
安全
Moderate activity — typical urban
76 / 100
日常生活
Transit access via 1 Av (L)
~3分钟 subway
Compliance · 10-year history
Violation timeline
DOB · HPD · OATH
201620182020202220242026
Violations & maintenance history
HPD · DOB · OATH — 36 open, 20 resolved
Tip: this building has 6 residential units and 36 open violations across all of them. To see only the records affecting your apartment, run a new search with your unit number (e.g. 5A or PH2) in the APT / UNIT field on the homepage.
Open Issues — 36
Minor
(a) § HMC: file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPD s website, www. NYC. Gov\hpd, search bed bugs.
HPD · Filed 2026年4月 · Open
Critical
At time of inspection I observed sidewalk shed installed on exposure #1 and 2 with inoperable light bulbs at underside the shed to bring illumination failure to provide lighting creates unsafe and mugging condi
OATH · Filed 2025年8月 · Open
Minor
(a) § HMC: file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPD s website, www. NYC. Gov\hpd, search bed bugs.
HPD · Filed 2025年6月 · Open
Minor
Atoi observed exterior wall insulation inboard installed basement level 2nd fl wall interior closed requested updated arch and en plans not provided, maintain/display required documents; maintain all approved a
OATH · Filed 2025年3月 · Open
Minor
Contractor failed to provide ssp, sws daily inspection & approved plans, dot permits & structural plans none could be provided. Stop all work under application m00702465 & maintain/keep available all the requir
OATH · Filed 2024年8月 · Open
Resolved History — 20 (showing 3)
Closed
Owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
§27-2107 ADM CODE
HPD · Filed 2024年11月 · Closed ·
Closed
Atoi observed active construction site sog poured request arch/en plans a-303.00 reflect r18 insulation no en plan on site. Elevator shift removed not as per a-300.00, maintain/display required documents; provid
OATH · Filed 2024年11月 · Closed
Closed
Observed debri container full, with garbage overflowing above the rim & not covered. Cover container when full to the rim & comply with code.
OATH · Filed 2024年8月 · Closed
Active9Resolved with debt1Resolved10Hover any dot for detail