最新抵押贷款:2007 年由 ASTORIA FEDERAL SAVINGS AND LOAN ASSOCIATION 提供,金额 US$800,000(另有 1 条,详见财务选项卡)· ACRIS
建筑详情
✓ 已验证 · PLUTO
建筑面积
13,700 sf
分区
R6
地下室
0
土地用途
多户步行楼
登记业主
787 Prospect Realty
租金管制
Yes · 11 regulated units(DHCR)
快速信息
这栋楼有多少户?
11 户住宅.
这栋楼有多高?
5 层, non-fireproof结构, 建于 1903 年.
地块有多大?
4,170 平方英尺 (40 × 92 ft).
建筑类别是什么?
C1 类 — Walk-up apt。
这块地上有几栋楼?
地块上 1 栋建筑.
总体前景
Long-term signal for residential or commercial viability
Stable — Review Maintenance
维护可靠性
Multiple open violations — proceed with caution
75 / 100
安全
Elevated activity — consider before signing
53 / 100
日常生活
Transit access via Prospect Av (2 5)
~2分钟 subway
Compliance · 10-year history
Violation timeline
DOB · HPD · OATH
201620182020202220242026
Active7Resolved with debt0Resolved43Hover any dot for detail
Violations & maintenance history
HPD · DOB · OATH — 7 open, 43 resolved
Open Issues — 7
Minor
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling
§ 27-2005 ADM CODEApt 4 · 2nd floor · 2nd apartment from south at west
HPD · Filed 2025年3月 · Open ·
Minor
§ 27-2017.3 HMC: trace and repair the source and abate the visible mold condition... More than (10) sq ft at ceiling
Apt 4 · 2nd floor · 2nd apartment from south at west
HPD · Filed 2025年3月 · Open ·
Minor
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( c) mdl and 28 rcny §25-171: replace or repair the self-closing doors that is missing or defective hinges at the 1st door from north at east
Apt 4 · 2nd floor · 2nd apartment from south at west
HPD · Filed 2025年3月 · Open ·
Critical
§ 27-2056.6 ADM code - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall
Apt 7 · 4th floor · 8th room from east · 1st apartment from south at west
HPD · Filed 2020年12月 · Open ·
Minor
Paint with light colored paint the ceiling ceiling
§ 27-2013 ADM CODEApt 7 · 4th floor · 1st apartment from south at west
HPD · Filed 2020年12月 · Open ·
Resolved History — 43 (showing 3)
Closed
§ 27-2026, 2027 HMC: properly repair the source and abate the evidence of a water leak at ceiling
Apt 4 · 2nd floor · 2nd apartment from south at west
HPD · Filed 2025年3月 · Closed ·
Closed
Properly repair with similar material the broken or defective fire retardant material at ceiling and north wall at public hall, 1st story
§ 27-2005 ADM CODE
HPD · Filed 2025年2月 · Closed ·
Closed
Properly repair or replace the broken or defective latch door from street to 1st story at public hall