Long-term signal for residential or commercial viability
Standard Urban
维护可靠性
Minor open violations — review details
94 / 100
安全
Moderate activity — typical urban
71 / 100
日常生活
Transit access via Zerega Av (6)
~8分钟 subway
Compliance · 10-year history
Violation timeline
DOB · HPD · OATH
201620182020202220242026
Active2Resolved with debt0Resolved15Hover any dot for detail
Violations & maintenance history
HPD · DOB · OATH — 2 open, 48 resolved
Open Issues — 2
Minor
Properly repair or replace the broken or defective latch and assembly at building entrance door ( from street to vestibule) , 1st story
§ 27-2005 HMC
HPD · Filed 2025年11月 · Open ·
Minor
Fire escape defective. Replace with new the broken, defective and/or missing front bottom rail building front south at fire escape, 2nd story
§ 27-2005 ADM CODE
HPD · Filed 2024年2月 · Open ·
Resolved History — 48 (showing 3)
Closed
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( c) mdl and 28 rcny §25-171: replace or repair the self-closing doors that is missing or defective latch at building entrance door ( from street to vestibule) , 1st story
HPD · Filed 2025年11月 · Closed
Closed
(a) § HMC: file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPD s website, www. NYC. Gov\hpd, search bed bugs.
HPD · Filed 2024年4月 · Closed
Closed
§ 27-2017.3 HMC: trace and repair the source and abate the visible mold condition... Approx 1SQ ft at ceiling in boiler closet
Apt 1B · 1st floor · 1st apartment from north at east