Long-term signal for residential or commercial viability
Elevated Risk
维护可靠性
Multiple open violations — proceed with caution
20 / 100
安全
Moderate activity — typical urban
74 / 100
日常生活
Transit access via 86 St (Q)
~3分钟 subway
Compliance · 10-year history
Violation timeline
DOB · HPD · OATH
201620182020202220242026
Violations & maintenance history
HPD · DOB · OATH — 31 open, 27 resolved
Tip: this building has 10 residential units and 31 open violations across all of them. To see only the records affecting your apartment, run a new search with your unit number (e.g. 5A or PH2) in the APT / UNIT field on the homepage.
Open Issues — 31
Minor
No access. No certificate of correction on file for violation #39152587Y issued 7/1/2025 for failure to provide unobstructed means of egress at 5th floor, where a refrigerator was observed blocking the stairway
OATH · Filed 2026年5月 · Open
Critical
Failure to provide unobstructed exit passageway at time of inspection observed on the 5th floor a refrigerator blocking exit stairs to the roof creating a hazards for tenants incase of emergency., remove obstru
OATH · Filed 2025年7月 · Open
Minor
Properly repair with similar material the broken or defective wood window frame at north wall
§ 27-2005 ADM CODEApt 4W · 4th floor · 1st apartment from west at north
HPD · Filed 2021年5月 · Open ·
Minor
Paint with light colored paint all walls and ceiling
§ 27-2013 ADM CODEApt 4W · 4th floor · 1st apartment from west at north
HPD · Filed 2021年5月 · Open ·
Minor
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall
§ 27-2005 ADM CODEApt 4W · 4th floor · 1st apartment from west at north
HPD · Filed 2021年5月 · Open ·
Resolved History — 27 (showing 3)
Closed
No after-hours variance permit. At time of inspection observed 3 workers at APT 2W performing interior work on saturday 8/16/2025. Upon review no afterhours permit was issued in DOB or in bis. Stop all ahv work
OATH · Filed 2025年8月 · Closed
Closed
Failure to conduct a final inspection of permitted work with the DEPT of building observed job permit # m08044281-i1-gc exp on 10/06/2024 as required wthin 1 year after the expiration of permit has not been sig
OATH · Filed 2025年7月 · Closed
Closed
Properly secure the loose 8th marble tread up from bottom at public hall stairs, 2nd story
§ 27-2005 ADM CODE
HPD · Filed 2024年12月 · Closed ·
Active15Resolved with debt1Resolved15Hover any dot for detail