最新抵押贷款:2021 年由 STERLING NATIONAL BANK 提供,金额 US$3,447,108(另有 2 条,详见财务选项卡)· ACRIS
建筑详情
✓ 已验证 · PLUTO
建筑面积
36,000 sf
分区
R5
地下室
半地下室
土地用途
多户步行楼
登记业主
Linden Heights LLC
租金管制
Yes · 42 regulated units(DHCR)
快速信息
这栋楼有多少户?
42 户住宅.
这栋楼有多高?
4 层, non-fireproof结构, 建于 1924 年.
地块有多大?
13,500 平方英尺 (100 × 135 ft).
建筑类别是什么?
C1 类 — Walk-up apt。
这块地上有几栋楼?
地块上 1 栋建筑.
总体前景
Long-term signal for residential or commercial viability
Elevated Risk
维护可靠性
Multiple open violations — proceed with caution
20 / 100
安全
Moderate activity — typical urban
79 / 100
日常生活
Transit access via Church Av (2 5)
~5分钟 subway
Compliance · 10-year history
Violation timeline
DOB · HPD · OATH
201620182020202220242026
Active50Resolved with debt2Resolved0Hover any dot for detail
Violations & maintenance history
HPD · DOB · OATH — 50 open, 2 resolved
Tip: this building has 42 residential units and 50 open violations across all of them. To see only the records affecting your apartment, run a new search with your unit number (e.g. 5A or PH2) in the APT / UNIT field on the homepage.
Open Issues — 50
Minor
(a) § HMC: file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPD s website, www. NYC. Gov\hpd, search bed bugs.
HPD · Filed 2026年5月 · Open
Minor
Properly repair with similar material the broken or defective fire retardant plaster at ceiling at public hall, 4th story, section at west
§ 27-2005 ADM CODE
HPD · Filed 2026年4月 · Open ·
Minor
Repair the roof so that it will not leak over the ceiling at public hall, 4th story, section at west
§ 27-2005 ADM CODE
HPD · Filed 2026年4月 · Open ·
Minor
Paint with light colored paint the ceiling at public hall, 4th story, section at west
§ 27-2013 ADM CODE
HPD · Filed 2026年4月 · Open ·
Minor
Refit vestibule door
§ 27-2005 HMC
HPD · Filed 2026年4月 · Open ·
Resolved History — 2
Closed
At time of inspection observed a window header on 3rd floor left side of exposure#1 in disrepair. Observed window header have 2 loose pieces that are not secured., repair and/or replace
OATH · Filed 2024年8月 · Closed
Closed
At time of inspection observed at courtyards cracks on facade wall, at all exposure damaged bricks eroded/missing mortar joints at multiple locations., maintain exterior building wall