Long-term signal for residential or commercial viability
Stable — Review Maintenance
维护可靠性
Multiple open violations — proceed with caution
82 / 100
安全
Elevated activity — consider before signing
59 / 100
日常生活
Transit access via 46 St-Bliss St (7)
~3分钟 subway
Compliance · 10-year history
Violation timeline
DOB · HPD · OATH
201620182020202220242026
Active3Resolved with debt0Resolved11Hover any dot for detail
Violations & maintenance history
HPD · DOB · OATH — 4 open, 43 resolved
Open Issues — 4
Minor
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling
§ 27-2005 ADM CODEApt 1B · 1st floor · 2nd room from east · 1st apartment from east at south
HPD · Filed 2026年4月 · Open ·
Minor
§ 27-2026, 2027 HMC: properly repair the source and abate the evidence of a water leak at ceiling
Apt 1B · 1st floor · 2nd room from east · 1st apartment from east at south
HPD · Filed 2026年4月 · Open ·
Minor
§ 27-2017.3 HMC: trace and repair the source and abate the visible mold condition... Less than 1O sq ft at ceiling
Apt 1B · 1st floor · 2nd room from east · 1st apartment from east at south
HPD · Filed 2026年4月 · Open ·
Minor
D26-13.03 ADM code abate the nuisance consisting of vermin mice & roaches thruout 1 sty north APT 1A.
Apt 1A
HPD · Filed 1988年10月 · Open ·
Resolved History — 43 (showing 3)
Closed
Properly repair with similar material the broken or defective fire retardant material ceiling vestibule area at public hall, 1st story
§ 27-2005 ADM CODE
HPD · Filed 2025年1月 · Closed ·
Closed
§ 27-2046.1 HMC: post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
HPD · Filed 2025年1月 · Closed
Closed
Paint with light colored paint ceiling vestibule area at public hall, 1st story