Long-term signal for residential or commercial viability
Stable — Review Maintenance
维护可靠性
Multiple open violations — proceed with caution
80 / 100
安全
Elevated activity — consider before signing
27 / 100
日常生活
Transit access via Junction Blvd (7)
~5分钟 subway
Compliance · 10-year history
Violation timeline
DOB · HPD · OATH
201620182020202220242026
Violations & maintenance history
HPD · DOB · OATH — 5 open, 45 resolved
Open Issues — 5
Minor
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls
§ 27-2005 ADM CODEApt B1 · 2nd floor · 5th room from east
HPD · Filed 2025年12月 · Open ·
Minor
§ 27-2017.3 HMC: trace and repair the source and abate the visible mold condition... Greater than 30 square feet at ceiling and all walls
Apt B4 · 2nd floor
HPD · Filed 2025年5月 · Open ·
Minor
§ 27-2010, 2011, 2012 ADM code remove the accumulation of refuse and/or rubbish and maintain in a clean condition the floor at public hall, 2nd story, section at north
HPD · Filed 2025年5月 · Open
Minor
Provide an adequate supply of gas to the fixtures at range
§ 27-2070 ADM CODEApt C10 · 3rd floor
HPD · Filed 2025年5月 · Open ·
Minor
§ 27-2017.3 HMC: trace and repair the source and abate the visible mold condition... Greater than 30 sq feet at all walls and ceiling
Apt B4 · 2nd floor
HPD · Filed 2025年5月 · Open ·
Resolved History — 45 (showing 3)
Closed
Remove all obstructions and repair all defects in bath tub wasteline
§ 27-2026 ADM CODEApt B4 · 2nd floor · 1st apartment from south at west
HPD · Filed 2026年3月 · Closed ·
Closed
Provide ready access to buildings heating system boiler room door locked at cellar at boiler room
§ 27-2033 ADM CODE
HPD · Filed 2026年1月 · Closed ·
Closed
Provide an adequate supply of heat for the apartment
§ 27-2029 ADM CODEApt B7 · 2nd floor · 1st apartment from north at east
HPD · Filed 2026年1月 · Closed ·
Active5Resolved with debt0Resolved45Hover any dot for detail